Difference between revisions of "AIPINJ Layouts"
Jump to navigation
Jump to search
(Blanked the page) |
|||
Line 1: | Line 1: | ||
+ | == Existing April 2020 Injector Layout == | ||
+ | * Existing April 2020 injector quick reference (thanks, Daniel!) : [[media:12GeV_injector_quick_reference_rev16.pdf]] | ||
+ | ==Overall Layouts== | ||
+ | Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings. | ||
+ | * July 19, 2019 [[media:keytotaljuly19.pdf]] | ||
+ | * July 17, 2019 [[media:keytotaljuly17.pdf]] | ||
+ | |||
+ | ==Gun Layouts== | ||
+ | * Aug 21, 2020 [[media:SONGSHEET AUGUST 21 dm comments.pdf]] Draft/preliminary songsheet | ||
+ | * Apr 15, 2020 [[media:beamlinelayoutapril15.pdf]] attached is the latest layout for the beamline components | ||
+ | * Apr 07, 2020 [[media:beamlinelayoutapril7.pdf]] puzzling A1/A2 layout, moving FX 2" upstream | ||
+ | * Mar 26, 2020 [[media:beamlinelayoutmarch26.pdf]] | ||
+ | * Mar 09, 2020 [[media:BEAMLINELAYOUTMAR09.pdf]] 90% complete layout; note bellows on A1/A2 girder | ||
+ | * Feb 26, 2020 [[media:BEAMLINELAYOUTFEB26.pdf]] edits post ME meeting, small corrections | ||
+ | :-sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve. | ||
+ | :-remove the pink rectangular placeholders for quadrupoles | ||
+ | :-sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached | ||
+ | :-restore gap between the FG solenoids as exists in tunnel today | ||
+ | :-sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows | ||
+ | :-if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown | ||
+ | * Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections | ||
+ | * Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1 | ||
+ | * Jan 31, 2020 [[media:200203_layout.pdf]] major revision, for functionality to setup the beam line | ||
+ | * Jan 22, 2020 [[media:layout01232020.pdf]] move 2nd lens to accomodate 2-3/4" or 4-1/2" window | ||
+ | * Jan 15, 2020 [[media:200115_gun2chopper.pdf]] restore MFA0I03 and MFA0I05 to beam line | ||
+ | * Jul 17, 2019 [[media:gunthroughchopperjuly17.pdf]] | ||
+ | * Jun 13, 2019 [[media:190613_guntochopper.pdf]] | ||
+ | |||
+ | ==Chopper Layouts== | ||
+ | * chopper assembly [[media:190606_chopper_assembly_drawing.pdf]] | ||
+ | |||
+ | ==Booster Layouts== | ||
+ | Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings. | ||
+ | * Sep 26, 2019 [[media:190926_boosterregion.pdf]] | ||
+ | ::-QCM was .32" further downstream. so all those interfaces moved. | ||
+ | ::-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66". | ||
+ | ::-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream. | ||
+ | ::-YAO cavity was .37" longer than the design drawing. | ||
+ | * July 17, 2019 [[media:chopperthroughmodulejuly17.pdf]] | ||
+ | * June 10, 2019 [[media:190610_layoutjune10.pdf]] | ||
+ | |||
+ | ==Warm-RF Drawings== | ||
+ | * prebuncher cavity [[media:190613_prebuncher.pdf]] | ||
+ | * buncher cavity [[media:190815_CEBAF_BUNCHER.pdf]] | ||
+ | * chopper RF cavity [[media:Haimson_chopper_cavities.pdf]] | ||
+ | |||
+ | ==SRF Drawings== | ||
+ | * drawing from Jim Henry [[media:CRM1107001-0001_-_PDF_1.pdf]] |
Revision as of 13:38, 27 August 2020
Existing April 2020 Injector Layout
- Existing April 2020 injector quick reference (thanks, Daniel!) : media:12GeV_injector_quick_reference_rev16.pdf
Overall Layouts
Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- July 19, 2019 media:keytotaljuly19.pdf
- July 17, 2019 media:keytotaljuly17.pdf
Gun Layouts
- Aug 21, 2020 media:SONGSHEET AUGUST 21 dm comments.pdf Draft/preliminary songsheet
- Apr 15, 2020 media:beamlinelayoutapril15.pdf attached is the latest layout for the beamline components
- Apr 07, 2020 media:beamlinelayoutapril7.pdf puzzling A1/A2 layout, moving FX 2" upstream
- Mar 26, 2020 media:beamlinelayoutmarch26.pdf
- Mar 09, 2020 media:BEAMLINELAYOUTMAR09.pdf 90% complete layout; note bellows on A1/A2 girder
- Feb 26, 2020 media:BEAMLINELAYOUTFEB26.pdf edits post ME meeting, small corrections
- -sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
- -remove the pink rectangular placeholders for quadrupoles
- -sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
- -restore gap between the FG solenoids as exists in tunnel today
- -sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
- -if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
- Feb 07, 2020 media:beamlinelayoutfeb07.pdf edits post ME meeting, small corrections
- Feb 04, 2020 media:BEAMLINELAYOUTFEB04.pdf edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
- Jan 31, 2020 media:200203_layout.pdf major revision, for functionality to setup the beam line
- Jan 22, 2020 media:layout01232020.pdf move 2nd lens to accomodate 2-3/4" or 4-1/2" window
- Jan 15, 2020 media:200115_gun2chopper.pdf restore MFA0I03 and MFA0I05 to beam line
- Jul 17, 2019 media:gunthroughchopperjuly17.pdf
- Jun 13, 2019 media:190613_guntochopper.pdf
Chopper Layouts
- chopper assembly media:190606_chopper_assembly_drawing.pdf
Booster Layouts
Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- Sep 26, 2019 media:190926_boosterregion.pdf
- -QCM was .32" further downstream. so all those interfaces moved.
- -distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
- -buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
- -YAO cavity was .37" longer than the design drawing.
- July 17, 2019 media:chopperthroughmodulejuly17.pdf
- June 10, 2019 media:190610_layoutjune10.pdf
Warm-RF Drawings
- prebuncher cavity media:190613_prebuncher.pdf
- buncher cavity media:190815_CEBAF_BUNCHER.pdf
- chopper RF cavity media:Haimson_chopper_cavities.pdf
SRF Drawings
- drawing from Jim Henry media:CRM1107001-0001_-_PDF_1.pdf