==apertures==
 
==apertures==
Original aperture design 58432-C-0340: https://misportal.jlab.org/jlabDocs/docDownload/7973
+
*Original aperture design 58432-C-0340: https://misportal.jlab.org/jlabDocs/docDownload/7973
 
*Assembly with brazed cooling lines: 28921-D-0001/0002: https://misportal.jlab.org/jlabDocs/docDownload/11580
 
*Assembly with brazed cooling lines: 28921-D-0001/0002: https://misportal.jlab.org/jlabDocs/docDownload/11580
 
*Modifications: found drawings with 1 mm hole, physical parts have 2 and 4 mm holes from install in CEBAF, opening both to 6 mm then rechampfering to maintain 0.125" thickness at hole.
 
*Modifications: found drawings with 1 mm hole, physical parts have 2 and 4 mm holes from install in CEBAF, opening both to 6 mm then rechampfering to maintain 0.125" thickness at hole.
 +
 +
==chopper==
 +
*chopping chamber design drawings: VAC5550124-1015 (not present in engineering database)
 +
**Chopping Chamber outer shell assembly [[Media:VAC5550124-1015.pdf]]
 +
**Chopping Chamber end flanges [[Media:VAC5550124-1018.pdf]]
 +
**Chopping Chamber main body [[Media:VAC5550124-1019.pdf]]
 +
**Chopping Chamber support [[Media:VAC5550124-1023.pdf]]
 +
 +
==booster==
 +
*Haipeng's ppt presentation [[media:Haipeng's ppt presentation on booster.pptx]]
 +
*Haipeng's mathcad description of booster [[media:Haipeng's mathcad description of booster.pdf]]
 +
*SRF commissioning results of booster [[media:SRF booster commissioning results summary.xls]]
 +
*SRF commissioning results of 2-cell [[media:SRF commissioning results of 2-cell.xls]]
 +
*SRF commissioning results of 7-cell [[media:SRF commissioning results of 7-cell.xls]]
 +
*SRF commissioning results at UITF_no beam [[media:SRF commissioning results at UITF_no beam.pptx]]
 +
*[[images of booster]]

Latest revision as of 15:37, 6 March 2021

apertures

chopper

booster