Line 47: | Line 47: | ||
* Once ready, all safety documents must be forwarded to D. Meekins | * Once ready, all safety documents must be forwarded to D. Meekins | ||
* The chamber will be shipped with mercury in place but not N2O | * The chamber will be shipped with mercury in place but not N2O | ||
+ | |||
* Magnet dipole is signed off and out for bids | * Magnet dipole is signed off and out for bids | ||
* The Hall Probes has arrived at JLab | * The Hall Probes has arrived at JLab | ||
* Magnet Alignment Fixture is being fabricated by the Machine Shop | * Magnet Alignment Fixture is being fabricated by the Machine Shop | ||
+ | |||
* The collimator table and holders will be made of aluminum | * The collimator table and holders will be made of aluminum | ||
* The table should be wide enough to stack copper bricks to shield the back scattered gammas if needed | * The table should be wide enough to stack copper bricks to shield the back scattered gammas if needed | ||
* Need a list from Argonne of all the resources needed to run the bubble chamber (cables, power, ...) | * Need a list from Argonne of all the resources needed to run the bubble chamber (cables, power, ...) | ||
+ | |||
* Here is a sketch of the Injector Tunnel, Injector Service Building (ISB) and the Machine Control Center (MCC): | * Here is a sketch of the Injector Tunnel, Injector Service Building (ISB) and the Machine Control Center (MCC): |
Revision as of 16:28, 19 May 2014
We will meet in TL 2236 on Wednesday May 14 at 3:30 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Electron line status
- Layout media:140514_BubbleLayout.pdf
- Radiator media:140513_Radiator.pdf
3- Schedule
- Planning meetings
- reviews
- install kick-off
- commissioning plan
- Electron Line
- dismantle 5D
- fab/buy/build
- install
- controls
- checkout
- Prep work for chamber
- tunnel resources
- service building resources
- control room resources
- Install of chamber
- ship estimate
- install/checkout goals
- commissioning/test goals
Notes from this meeting:
- Bubble Chamber is ready to be filled with N2O
- Once ready, all safety documents must be forwarded to D. Meekins
- The chamber will be shipped with mercury in place but not N2O
- Magnet dipole is signed off and out for bids
- The Hall Probes has arrived at JLab
- Magnet Alignment Fixture is being fabricated by the Machine Shop
- The collimator table and holders will be made of aluminum
- The table should be wide enough to stack copper bricks to shield the back scattered gammas if needed
- Need a list from Argonne of all the resources needed to run the bubble chamber (cables, power, ...)
- Here is a sketch of the Injector Tunnel, Injector Service Building (ISB) and the Machine Control Center (MCC):