** Follow-up with EMC re-making coil
 
** Follow-up with EMC re-making coil
 
** Tally list of jobs once magnet on-site
 
** Tally list of jobs once magnet on-site
 +
 +
* Nick's to-do's
 +
** Reports procurement goosed Kepco, they shipped PS 8/24 2nd day, should be here imminently!
  
 
* Gary's to-do's
 
* Gary's to-do's
Line 20: Line 23:
 
* Joe's to-do's
 
* Joe's to-do's
 
** Circuit installed 8/22
 
** Circuit installed 8/22
** I&C and DC power cables pulls today 8/24
+
** I&C and DC power cables pulls today 8/24 => https://logbooks.jlab.org/entry/4033656
 
** 6" reducers ordered 1-2 weeks
 
** 6" reducers ordered 1-2 weeks
** Flanges for spool on-hand
+
** Flanges for dump spool on-hand
 
** Other kicker flanges (back)ordered 1-2 weeks lead time
 
** Other kicker flanges (back)ordered 1-2 weeks lead time
  

Latest revision as of 07:57, 25 August 2022

Thursday's @ 9am EDT by Zoom

New UITFList entries

Last Week's Action Items

  • Sandesh/Probir to-do's
    • Follow-up with EMC re-making coil
    • Tally list of jobs once magnet on-site
  • Nick's to-do's
    • Reports procurement goosed Kepco, they shipped PS 8/24 2nd day, should be here imminently!
  • Gary's to-do's
    • extend spool and support two locations
    • relocate table further downstream
    • layout modifications for lead wall with hole => Al covers dropped off w/ Vince + Joe submit sho pjob
    • check stand status at mech. shop => most of stand picked up, waiting on top plate + rails
  • Joe's to-do's
    • Circuit installed 8/22
    • I&C and DC power cables pulls today 8/24 => https://logbooks.jlab.org/entry/4033656
    • 6" reducers ordered 1-2 weeks
    • Flanges for dump spool on-hand
    • Other kicker flanges (back)ordered 1-2 weeks lead time
  • DAQ to-do's
    • Chris complete rack, move to Mech Room
    • Brad put DAQ on network
    • Riad/Chris decide order Triax adapters, tell Keith/Chris how you want triax terminated at UITF
    • Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
    • Bryan - work with Gary for soft ioc and Brad to activate network port
  • Greg's to-do's
    • compute integrated asymmetry
    • use slurm to run jobs on farm
    • simulate 5 configurations