Difference between revisions of "PPB - November 30, 2022"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 19: | Line 19: | ||
** Andriy - Conceptual Design of a High-Power Target for Positron Production at CEBAF [[media:IPAC23-Target-Abstract-v2.docx]] | ** Andriy - Conceptual Design of a High-Power Target for Positron Production at CEBAF [[media:IPAC23-Target-Abstract-v2.docx]] | ||
** Feedback by : 12/2 | ** Feedback by : 12/2 | ||
− | * Sami's updates [[ | + | * Sami's updates [[File:QWT_System_optimization_Nov_30_polarized_and_unpolarized]]. |
* Other updates | * Other updates |
Latest revision as of 15:31, 1 December 2022
Coordinates
- On-site => Wednesdays @ 11am EDT in TL-2236
- Zoom => https://jlab-org.zoomgov.com/j/1609550529?pwd=RlNJYytUSk1tbzNJeUIxNUptTk9UzQT09&from=addon
Agenda
- US-Japan Meeting with KEK/SLAC - December 1
- 10:00-12:00 - Test Lab Rm. 1227
- Joe - intro
- Carlos - 400 kV polarized gun
- Andriy - target fatigue studies
- Silviu - target R&D development plan
- Open floor topics - if there are others
- 13:00-14:30 - Tours: LERF (GTS, Vault, Lab6), ARC
- 15:00-17:00 - CC F226
- Finalize topics, writing assignments, budget assignments, paper coordination
- Zoom call between JLAB/SLAC/KEK
- 10:00-12:00 - Test Lab Rm. 1227
- IPAC'23 (submission deadline 12/7)
- Joe - Ce+BAF : Polarized and Unpolarized Positron Beam Capability at CEBAF 12 GeV media:IPAC23-Positrons-Grames_v1.docx
- Andriy - Conceptual Design of a High-Power Target for Positron Production at CEBAF media:IPAC23-Target-Abstract-v2.docx
- Feedback by : 12/2
- Sami's updates File:QWT System optimization Nov 30 polarized and unpolarized.
- Other updates