Difference between revisions of "MOLLER PQB Meeting October 30, 2024"
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
* JLAB Prototype HV Driver: | * JLAB Prototype HV Driver: | ||
## Burn-in at 30 Hz on-going | ## Burn-in at 30 Hz on-going | ||
− | ## RTP Driver Prototype Crosstalk tests - Jim Kortze: [[media:]] | + | ## RTP Driver Prototype Crosstalk tests - Jim Kortze: [[media:RTP_prototype_Crosstalk_tests.pdf]] [[media:RTP_prototype_Crosstalk_tests.pptx]] |
## Installation Schedule: [[media:RTP_Installation_Schedule.pdf]] | ## Installation Schedule: [[media:RTP_Installation_Schedule.pdf]] | ||
− | * '''Injector | + | * '''Injector beam commissioning and studies start Nov 25''' |
Latest revision as of 04:23, 30 October 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- JLAB Prototype HV Driver:
- Burn-in at 30 Hz on-going
- RTP Driver Prototype Crosstalk tests - Jim Kortze: media:RTP_prototype_Crosstalk_tests.pdf media:RTP_prototype_Crosstalk_tests.pptx
- Installation Schedule: media:RTP_Installation_Schedule.pdf
- Injector beam commissioning and studies start Nov 25