Difference between revisions of "MOLLER PQB Meeting October 30, 2024"

From Ciswikidb
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
* JLAB Prototype HV Driver:
 
* JLAB Prototype HV Driver:
 
## Burn-in at 30 Hz on-going
 
## Burn-in at 30 Hz on-going
## RTP Driver Prototype Crosstalk tests - Jim Kortze: [[media:RTP_prototype_Crosstalk_tests.pdf]]
+
## RTP Driver Prototype Crosstalk tests - Jim Kortze: [[media:RTP_prototype_Crosstalk_tests.pdf]]  [[media:RTP_prototype_Crosstalk_tests.pptx]]
 
## Installation Schedule: [[media:RTP_Installation_Schedule.pdf]]
 
## Installation Schedule: [[media:RTP_Installation_Schedule.pdf]]
  
  
* '''Injector Beam Commissioning and Studies start Nov 25 '''
+
* '''Injector beam commissioning and studies start Nov 25'''

Latest revision as of 04:23, 30 October 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • JLAB Prototype HV Driver:
    1. Burn-in at 30 Hz on-going
    2. RTP Driver Prototype Crosstalk tests - Jim Kortze: media:RTP_prototype_Crosstalk_tests.pdf media:RTP_prototype_Crosstalk_tests.pptx
    3. Installation Schedule: media:RTP_Installation_Schedule.pdf


  • Injector beam commissioning and studies start Nov 25