Difference between revisions of "Wednesday October 1, 2014"

From Ciswikidb
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 13: Line 13:
 
2- Safety Requirements: [[media:Bubble_Safety_Meekins.pdf]].
 
2- Safety Requirements: [[media:Bubble_Safety_Meekins.pdf]].
  
3- FLUKA simulation of raidator/dump:[[media:radiator_FLUKA.pdf]] [[media:radiator_FLUKA.pptx]]. Results of GEANT4 simulation were shown on [[Wednesday April 16, 2014]].
+
3- FLUKA simulation of radiator/dump:[[media:radiator_FLUKA.pdf]] [[media:radiator_FLUKA.pptx]]. Results of GEANT4 simulation were shown on [[Wednesday April 16, 2014]].
  
  
Line 23: Line 23:
  
 
* Bubble Chamber:  
 
* Bubble Chamber:  
# Tried differentially cooled mercury (N<sub>2</sub>O at meniscus is not superheated) --> No more bubbles at interface.
+
# New glass cell has been designed and is being fabricated.
# Finalizing design and ready for testing very soon.
+
# Chamber has been disassembled and will be put back together with the new glass cell that allows for active cooling of mercury.
 +
# Planning to bring to JLab in January 2014.
 +
 
 +
* Review of Equipment (i.e., '''''Bubble Chamber''''') is planned to start in December 2014.
 +
 
 +
* FLUKA model will be expanded upon to include the full geometry of beamline and Bubble Chamber. This work is in parallel to the effort on GEANT4.

Latest revision as of 16:29, 1 October 2014

We will meet in TL 2236 on Wednesday October 1 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne.

2- Safety Requirements: media:Bubble_Safety_Meekins.pdf.

3- FLUKA simulation of radiator/dump:media:radiator_FLUKA.pdf media:radiator_FLUKA.pptx. Results of GEANT4 simulation were shown on Wednesday April 16, 2014.




Notes from this meeting:

  • Bubble Chamber:
  1. New glass cell has been designed and is being fabricated.
  2. Chamber has been disassembled and will be put back together with the new glass cell that allows for active cooling of mercury.
  3. Planning to bring to JLab in January 2014.
  • Review of Equipment (i.e., Bubble Chamber) is planned to start in December 2014.
  • FLUKA model will be expanded upon to include the full geometry of beamline and Bubble Chamber. This work is in parallel to the effort on GEANT4.