Difference between revisions of "PQB Meeting September 10, 2015"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
* Hall A progress report: | * Hall A progress report: | ||
− | # Modulation coils | + | # Modulation coils are in the right place. All work is complete and ready for test. |
+ | # There is plan to install the lumi detectors in Hall A beamline exit pipe. | ||
+ | # Cables for cavities on orders and will be pulled once they arrive. | ||
+ | # Working on installing the XYQ cavity set. | ||
+ | # Halo ladder installed with QWeak targets and detector table in place. Need to: | ||
+ | ## Re-design new targets and | ||
+ | ## Pull cables (signal + HV) for the halo detectors |
Revision as of 14:22, 10 September 2015
We will meet in TL 2236 Thursday September 10 at 1:00 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
- Ed Folts: Hall A beamline progress report
- Jay Benesch: CEBAF Injector Upgrade
- Original Accelerator Improvement Project (AIP) Charter (2010): media:INJ_Full_Energy_Injector_Upgrade_charter.docx
- Joe Grames, Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
- Jay Benesch, Advanced Injector: media:advanced_injector_PQB_10sep2015.pdf
Notes from this meeting:
- Hall A progress report:
- Modulation coils are in the right place. All work is complete and ready for test.
- There is plan to install the lumi detectors in Hall A beamline exit pipe.
- Cables for cavities on orders and will be pulled once they arrive.
- Working on installing the XYQ cavity set.
- Halo ladder installed with QWeak targets and detector table in place. Need to:
- Re-design new targets and
- Pull cables (signal + HV) for the halo detectors