Difference between revisions of "PQB Meeting September 10, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 27: Line 27:
 
# Cables for cavities on orders and will be pulled once they arrive.
 
# Cables for cavities on orders and will be pulled once they arrive.
 
# Working on installing the XYQ cavity set.
 
# Working on installing the XYQ cavity set.
# Halo ladder installed with QWeak targets and detector table in place. Need to:
+
# Halo ladder installed with its QWeak targets and detector table is in place. Still Need to:
## Re-design new targets and
+
## Re-design new targets
 
## Pull cables (signal + HV) for the halo detectors
 
## Pull cables (signal + HV) for the halo detectors

Revision as of 14:24, 10 September 2015

We will meet in TL 2236 Thursday September 10 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Ed Folts: Hall A beamline progress report
  2. Jay Benesch: CEBAF Injector Upgrade
    1. Original Accelerator Improvement Project (AIP) Charter (2010): media:INJ_Full_Energy_Injector_Upgrade_charter.docx
    2. Joe Grames, Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
    3. Jay Benesch, Advanced Injector: media:advanced_injector_PQB_10sep2015.pdf




Notes from this meeting:

  • Hall A progress report:
  1. Modulation coils are in the right place. All work is complete and ready for test.
  2. There is plan to install the lumi detectors in Hall A beamline exit pipe.
  3. Cables for cavities on orders and will be pulled once they arrive.
  4. Working on installing the XYQ cavity set.
  5. Halo ladder installed with its QWeak targets and detector table is in place. Still Need to:
    1. Re-design new targets
    2. Pull cables (signal + HV) for the halo detectors