Difference between revisions of "May 21, 2020 - ME/INJ/CIS/CASA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Meeting Info == We will meet Thursday @ 10am EDT <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334 Phone number (f...")
 
 
(18 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
== Talking Points - May 21 ==
 
== Talking Points - May 21 ==
  
 +
;Modeling
 +
* [[May 21, 2020 - Wien Quad Meeting]]
 +
* [[May 22, 2020 - 200 kV Wien filter assessment]]
  
 +
;Solenoid
 +
* Progress!
 +
[[File:200521_green_solenoid.jpg|thumb|left|First coat of green paint on "core"]]
  
 +
<div style="clear: both;"></div>
  
== Talking Points - Last week May 14 ==
+
;Y/Laser chamber viewers
; Solenoids
+
* Design status
* Joe's punch list (concentricities, painted surfaces)
 
* First article late May
 
  
;Y/Laser chamber viewers
+
;Wien Filter
* Same viewer assemblies
+
From Mike Beck - The 6 new "Wien" coils meet dimensional check acceptance criteria and counted turn count all as required at 2 layers x 13 turns per. Will put spread sheet with dimensional data together in coming days. Also, checked resistance on all 6, the range was consistent at ~.2 ohms. The visual quality of coils that Technicoil provided are nice in appearance.  Will conduct hipot testing when able to get back onsite and confirm the rest of QA acceptance testing, fit to core (when core arrives), and mapping required.
* New shorter tophats
+
 
* Garages
+
[[File:WEIN NEW COILS_5-20-2020.jpg|thumb|left|Wien coils in crate at MMF]]
  
;A1/A2
+
<div style="clear: both;"></div>
* Coils
 
  
;Prebuncher
+
;MHD A1/A2 Steering Coils
* No updates
+
* CED from Gary Croke => MHD:  BL = 28.5 G-cm/A with +/- 2A limits
 +
* Existing design 60 turns (approximately) coil using AWG 16 wire [[media:200521_aperture 1.pdf]] [[media:39200-0213.pdf]]
  
 
; PSS Kicker
 
; PSS Kicker
* Building model
+
* ME model status
 
* Getting quotes (2-4)
 
* Getting quotes (2-4)
 +
 +
; Wien quads
 +
* CED from Gary Croke => MQW: B'L = 15 G/A  with +/- 3A limits
  
 
;Songsheets
 
;Songsheets
 
* Will circulate when done
 
* Will circulate when done
 
; Modeling
 
* Dennis finishing quad solution, then call meeting w/ modelers, Lakshmi
 
* Alicia incorporated Wiens, now adding quads
 

Latest revision as of 08:58, 21 May 2020

Meeting Info

We will meet Thursday @ 10am EDT via BlueJeans
Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334
Phone number (for audio call in): 1-888-240-2560
Meeting ID: 909497334#

Talking Points - May 21

Modeling
Solenoid
  • Progress!
First coat of green paint on "core"
Y/Laser chamber viewers
  • Design status
Wien Filter
From Mike Beck - The 6 new "Wien" coils meet dimensional check acceptance criteria and counted turn count all as required at 2 layers x 13 turns per. Will put spread sheet with dimensional data together in coming days. Also, checked resistance on all 6, the range was consistent at ~.2 ohms. The visual quality of coils that Technicoil provided are nice in appearance.  Will conduct hipot testing when able to get back onsite and confirm the rest of QA acceptance testing, fit to core (when core arrives), and mapping required.
Wien coils in crate at MMF
MHD A1/A2 Steering Coils
PSS Kicker
  • ME model status
  • Getting quotes (2-4)
Wien quads
  • CED from Gary Croke => MQW: B'L = 15 G/A with +/- 3A limits
Songsheets
  • Will circulate when done