Difference between revisions of "Wednesday April 16, 2014"
Jump to navigation
Jump to search
(8 intermediate revisions by 2 users not shown) | |||
Line 11: | Line 11: | ||
2- Bubble Chamber Schedule at JLab [[media:141409_BubbleDemoInstall.pdf]] [[media:141409_BubbleDemoInstall.xlsx]] | 2- Bubble Chamber Schedule at JLab [[media:141409_BubbleDemoInstall.pdf]] [[media:141409_BubbleDemoInstall.xlsx]] | ||
− | 3- Radiator | + | 3- Radiator: |
− | * Radiator dimensions | + | * Radiator dimensions [[media:Bubble_Chamber_Radiator_April2014.pdf]] [[media:Bubble_Chamber_Radiator_April2014.pptx]] |
− | * Thermal analysis plan | + | * Thermal analysis plan [[media:140415_Bubble_Radiator_TA.pdf]] [[media:140415_Bubble_Radiator_TA.pptx]] |
− | 4- New "5 MeV" Dipole | + | 4- New "5 MeV" Dipole: |
* Fixture design completed [[media:140415_DL_Fixture.pdf]] | * Fixture design completed [[media:140415_DL_Fixture.pdf]] | ||
* Update of DL design | * Update of DL design | ||
* Ambient field measurements | * Ambient field measurements | ||
+ | |||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Notes from this meeting:''' | ||
+ | |||
+ | * Argonne has completed Bubble Chamber safety reviews. | ||
+ | |||
+ | * GEANT4 simulation of the radiator thickness has been updated. We will go with 6 mm thickness; please let us know if you have another choice. | ||
+ | |||
+ | * Need a plan to deal with Earth's field. Wrapping the beamline with mu-metal might complicate the problem. |
Latest revision as of 09:22, 26 April 2014
We will meet in TL 2236 on Wednesday April 16 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Bubble Chamber Schedule at JLab media:141409_BubbleDemoInstall.pdf media:141409_BubbleDemoInstall.xlsx
3- Radiator:
- Radiator dimensions media:Bubble_Chamber_Radiator_April2014.pdf media:Bubble_Chamber_Radiator_April2014.pptx
- Thermal analysis plan media:140415_Bubble_Radiator_TA.pdf media:140415_Bubble_Radiator_TA.pptx
4- New "5 MeV" Dipole:
- Fixture design completed media:140415_DL_Fixture.pdf
- Update of DL design
- Ambient field measurements
Notes from this meeting:
- Argonne has completed Bubble Chamber safety reviews.
- GEANT4 simulation of the radiator thickness has been updated. We will go with 6 mm thickness; please let us know if you have another choice.
- Need a plan to deal with Earth's field. Wrapping the beamline with mu-metal might complicate the problem.