Difference between revisions of "UITF Operations"

From Ciswikidb
Jump to navigation Jump to search
 
(17 intermediate revisions by 3 users not shown)
Line 9: Line 9:
 
<td bgcolor="#e0e0f0" valign=top>
 
<td bgcolor="#e0e0f0" valign=top>
 
*[[UITC_meeting_minutes|General]]
 
*[[UITC_meeting_minutes|General]]
*[[Meeting_minutes|Experiment In-progress]]
+
*[[E-beam_Irradiation_Experiment|Experiment In-progress]]
 
<hr> <!-- line -->
 
<hr> <!-- line -->
 
<b>Configuration</b>
 
<b>Configuration</b>
Line 16: Line 16:
 
*[[Beamline_Layout|ME Drawings]]
 
*[[Beamline_Layout|ME Drawings]]
 
*[[Beamline_Layout|Elegant/Model Data]]
 
*[[Beamline_Layout|Elegant/Model Data]]
*[[UITC_technical_areas|Other data]]
+
*[[UITC_technical_areas|Technical areas]]
 
<hr>
 
<hr>
 
<b>Work Controls</b>
 
<b>Work Controls</b>
Line 24: Line 24:
 
<hr>
 
<hr>
 
<b>Users (Past/Present)</b>
 
<b>Users (Past/Present)</b>
* [[Beamline_for_water_sample_irradiation| Wastewater Irradiation]]
+
* [[E-beam Irradiation Experiment| Wastewater Irradiation]]
 
* [[HDIce| HDIce]]
 
* [[HDIce| HDIce]]
 
<hr>
 
<hr>
Line 35: Line 35:
 
*[[Data_Acquisition_and_Control_racks|UITF Rack Layout]]
 
*[[Data_Acquisition_and_Control_racks|UITF Rack Layout]]
 
*Inventories
 
*Inventories
 +
*[[UITF_Tasks_Requiring_Attention| 'To-do' list]]
 
</td>
 
</td>
  
Line 95: Line 96:
 
* [[CIS @ UITF]]
 
* [[CIS @ UITF]]
 
* [[UITF_Official_Documents| Official Documents]]
 
* [[UITF_Official_Documents| Official Documents]]
* [https://misportal.jlab.org/railsForms/rad_work_permits/112286/briefing UITF RWP (2021-S014)]
+
* [https://misportal.jlab.org/railsForms/rad_work_permits/124774/briefing UITF RWP (2022-S014)]
 
* [[UITC Operations| Old UITC Operations Page]]
 
* [[UITC Operations| Old UITC Operations Page]]
 
</td>
 
</td>
Line 124: Line 125:
 
* [http://ued.acc.jlab.org UED]
 
* [http://ued.acc.jlab.org UED]
 
* [[UITF_Operation_How_To's| Common How-to]]
 
* [[UITF_Operation_How_To's| Common How-to]]
* [[Wastewater_Experiment_Commissioning_Plan]]
+
* [[Wastewater_Experiment_Commissioning_Plan| Wastewater Commissioning Plan]]
 +
* [https://accweb.acc.jlab.org/presenter/uitf-menu Shift leader summary]
 +
* [[UITF_Notes|Notes and random thoughts]]
 +
* [https://epicsweb.jlab.org/itf/wmenu/ EPICS Web (UITF)]
 
</td>
 
</td>
 
<!-- Column #2 -->
 
<!-- Column #2 -->
Line 151: Line 155:
 
<!-- Column #3 -->
 
<!-- Column #3 -->
 
<td bgcolor="#e0e0f0" valign="top">
 
<td bgcolor="#e0e0f0" valign="top">
*757-343-7123
+
*757-897-9408
 
*757-269-5572
 
*757-269-5572
 
*-
 
*-
Line 165: Line 169:
 
*6142
 
*6142
 
*876-7997
 
*876-7997
*7046,7047,& 7048
+
*7046,7047,7048
 
*269-7050
 
*269-7050
 
*269-7045
 
*269-7045
*-
+
*x7880; 630-803-1171
*-
+
*x7416; 757-641-0076
  
  
Line 178: Line 182:
 
* [[Document-Controlled_Procedures_and_Assessments_for_UITF|Procedures (Doc. Controlled)]]
 
* [[Document-Controlled_Procedures_and_Assessments_for_UITF|Procedures (Doc. Controlled)]]
 
* [[UITF_Procedures_not_managed_via_document_control|Procedures (In-house)]]
 
* [[UITF_Procedures_not_managed_via_document_control|Procedures (In-house)]]
* [[:Media:UITFOperators_7.27.21.doc|List of Qualified UITF Operators]]
+
* [[:Media:UITFOperator.doc|List of Qualified UITF Operators]]
* [https://misportal.jlab.org/railsForms/rad_work_permits/112286/briefing UITF RWP (2021-S014)]
+
* [https://misportal.jlab.org/railsForms/rad_work_permits/124774/briefing UITF RWP (2022-S014)]
 
</td>
 
</td>
 
</tr>
 
</tr>

Latest revision as of 08:28, 20 July 2022

Meetings

Configuration


Work Controls


Users (Past/Present)


Archival


Documentation

Welcome to the UITF Operations Wiki!


The Upgraded Injector Test Facility (or UITF) is located within the North-West side of the Test Lab (Bldg. 58), and exists to provide a robust proving ground for a variety of accelerator technologies as well as providing a venue in which to perform low energy physics experiments.

Matt.jpg Experimental Meetings Upcoming Schedule
UITF Meetings Logbook
Publications Posters & Proceedings
Talks Proposed Experiments
Past Experiments Facility Overview

Sign up to this mailing list to receive and share information within the UITF community.

Communication
Web Sites
Documentation
Shift Taker Information
Shift Prep
Contact List
Phone Numbers
Official Documents
  • UITF Facility Manager
  • UITF Facility Manager (Back up)
  • UITF Principle Investigator
  • UITF Cave [Gun]
  • UITF Cave [Quarter]
  • UITF Cave [Experiment]
  • UITF Laser Room
  • UITF Mezzanine (North/Gun)
  • UITF Mezzanine (South)
  • Control Room (Left)
  • Control Room (Center)
  • Control Room (Right)
  • Control Room (Wall)
  • Program Deputy
  • MCC
  • SSO
  • Crew Chief
  • Director of Operations
  • Dept. Director: Accelerator
  • 757-897-9408
  • 757-269-5572
  • -
  • 7355
  • 6144
  • 7356
  • 6143
  • 7359
  • 7358
  • 7351
  • 6141
  • 7354
  • 6142
  • 876-7997
  • 7046,7047,7048
  • 269-7050
  • 269-7045
  • x7880; 630-803-1171
  • x7416; 757-641-0076