UITF Procedures not managed via document control

From Ciswikidb
Jump to navigation Jump to search

Emergency Response Procedures

UITF Operator Training

Shielding related

Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

Start Up and Shutdown Procedures

booster-related

waste water irradiation-related

HDIce-related