Difference between revisions of "200 kV Polarized Gun"
Jump to navigation
Jump to search
(Created page with "==Meetings== 200 kV Gun - Jan 26, 2022 == Links == * [https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS Carlos 18" Gun Page]") |
|||
(49 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | + | * The 200 kV gun (R30-3 with spherical electrode and 18" gun HVC) was installed in CEBAF during SAD 2023. | |
− | [[200 kV Gun - Jan 26, 2022]] | + | * This gun performed as designed in terms of vacuum, and high voltage: no field emission at 200 kV after conditioning with Kr to ~240 kV. |
+ | * It has two problems: | ||
+ | ** The beam waist is ~ 6 cm downstream of the GaAs wafer, compared to ~ 40 cm from the Tee electrode 14" HVC R28-2 gun operated in CEBAF for years at 130 kV. | ||
+ | ** It was a not possible to obtain the laser retro-reflection. | ||
+ | * The gun was then removed from the injector and replaced with the R28-2 gun. | ||
+ | * The SAD 2024 links below capture the planning for fixing these problems in the R30-3 gun (which will be version R30-4) and for installing it in May 2024. | ||
+ | |||
+ | |||
+ | ==R30-4 200 kV Gun SharePoint site== | ||
+ | [https://jeffersonlab.sharepoint.com/:f:/s/CIS/Ejp9S0WdeXtPgFm_bwwkuEAB0gEzYKg7Ci0UfKK8qQnPfQ?e=1tfGAH R30-4 200 kV SharePoint site] | ||
+ | |||
+ | |||
+ | Contains: | ||
+ | * Pierce cathode end piece geometry and beam parameter space table | ||
+ | * Notes, studies, and documentation | ||
+ | * Electrostatics and beam dynamics modeling and simulation results | ||
+ | |||
+ | ==R30-4 200 kV Gun SAD 2024 Planning Meetings== | ||
+ | |||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Jan_05_2024 Jan 05, 2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Jan_10_2024 Jan 10,2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Jan_17_2024 Jan 17, 2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Jan_24_2024 Jan 24, 2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Jan_30_2024 Jan 31, 2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Feb_7_2024 Feb 7, 2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Feb_14_2024 Feb 14, 2024] | ||
+ | * >[https://wiki.jlab.org/ciswiki/index.php/Feb_21_2024 Feb 21, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Feb_28_2024 Feb 28, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Mar_6_2024 Mar 6, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Mar_13_2024 Mar 13, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Mar_20_2024 Mar 20, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Mar_27_2024 Mar 27, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Apr_03_2024 Apr 03, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Apr_10_2024 Apr 10, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Apr_17_2024 Apr 17, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/Apr_24_2024 Apr 24, 2024] | ||
+ | * [https://wiki.jlab.org/ciswiki/index.php/May_1_2024 May 1, 2024] | ||
+ | |||
+ | ==R30-3 200 kV Gun SAD 2023 Installation Links== | ||
+ | |||
+ | * ATLIS => https://tasklists.jlab.org/atlis/tasks/108541 | ||
+ | * Marcy's Gantt chart goes here => https://jeffersonlab-my.sharepoint.com/:x:/g/personal/marcy_jlab_org/EUe-xbLpNR1IsV28fyi20FUBC4bUllOnMnAYlXemA7C82Q | ||
+ | * List of photocathodes at end of Phase 1 (5/10/2021) - https://logbooks.jlab.org/entry/3876517 | ||
+ | |||
+ | ==R30-3 200 kV Gun SAD 2023 Planning Meetings== | ||
+ | |||
+ | * Feb 20, 2023 => * Carlos SAD schedule [[Media:Gun swap planning 1 week before and 1 week after SAD start.pptx]] | ||
+ | * Feb 02, 2022 => [[Feb 2, 2022 - Group meeting]] - Group meeting + 200 kV gun | ||
+ | * Jan 26, 2022 => [[200 kV Gun - Jan 26, 2022]] | ||
+ | |||
+ | ==Links== | ||
− | |||
* [https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS Carlos 18" Gun Page] | * [https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS Carlos 18" Gun Page] | ||
+ | * Gun Anode - Carlos's update https://wiki.jlab.org/ciswiki/index.php/Anode |
Latest revision as of 13:48, 30 April 2024
- The 200 kV gun (R30-3 with spherical electrode and 18" gun HVC) was installed in CEBAF during SAD 2023.
- This gun performed as designed in terms of vacuum, and high voltage: no field emission at 200 kV after conditioning with Kr to ~240 kV.
- It has two problems:
- The beam waist is ~ 6 cm downstream of the GaAs wafer, compared to ~ 40 cm from the Tee electrode 14" HVC R28-2 gun operated in CEBAF for years at 130 kV.
- It was a not possible to obtain the laser retro-reflection.
- The gun was then removed from the injector and replaced with the R28-2 gun.
- The SAD 2024 links below capture the planning for fixing these problems in the R30-3 gun (which will be version R30-4) and for installing it in May 2024.
Contains:
- Pierce cathode end piece geometry and beam parameter space table
- Notes, studies, and documentation
- Electrostatics and beam dynamics modeling and simulation results
R30-4 200 kV Gun SAD 2024 Planning Meetings
- >Jan 05, 2024
- >Jan 10,2024
- >Jan 17, 2024
- >Jan 24, 2024
- >Jan 31, 2024
- >Feb 7, 2024
- >Feb 14, 2024
- >Feb 21, 2024
- Feb 28, 2024
- Mar 6, 2024
- Mar 13, 2024
- Mar 20, 2024
- Mar 27, 2024
- Apr 03, 2024
- Apr 10, 2024
- Apr 17, 2024
- Apr 24, 2024
- May 1, 2024
R30-3 200 kV Gun SAD 2023 Installation Links
- ATLIS => https://tasklists.jlab.org/atlis/tasks/108541
- Marcy's Gantt chart goes here => https://jeffersonlab-my.sharepoint.com/:x:/g/personal/marcy_jlab_org/EUe-xbLpNR1IsV28fyi20FUBC4bUllOnMnAYlXemA7C82Q
- List of photocathodes at end of Phase 1 (5/10/2021) - https://logbooks.jlab.org/entry/3876517
R30-3 200 kV Gun SAD 2023 Planning Meetings
- Feb 20, 2023 => * Carlos SAD schedule Media:Gun swap planning 1 week before and 1 week after SAD start.pptx
- Feb 02, 2022 => Feb 2, 2022 - Group meeting - Group meeting + 200 kV gun
- Jan 26, 2022 => 200 kV Gun - Jan 26, 2022
Links
- Carlos 18" Gun Page
- Gun Anode - Carlos's update https://wiki.jlab.org/ciswiki/index.php/Anode