General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
+
* General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
+
* DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
  
 
=== Last Week's Action Items ===
 
=== Last Week's Action Items ===
* Sandesh/Probir
+
* Sandesh/Probir to-do's
 
** Follow-up with EMC re-making coil
 
** Follow-up with EMC re-making coil
 
** Tally list of jobs once magnet on-site
 
** Tally list of jobs once magnet on-site
  
* Gary's jobs
+
* Gary's to-do's
 
** extend spool and support two locations
 
** extend spool and support two locations
 
** relocate table further downstream
 
** relocate table further downstream
Line 18: Line 18:
 
** check stand status at mech. shop => most of stand picked up, waiting on top plate + rails
 
** check stand status at mech. shop => most of stand picked up, waiting on top plate + rails
  
* Joe's jobs
+
* Joe's to-do's
 
** Circuit installed 8/22
 
** Circuit installed 8/22
 
** I&C and DC power cables pulls today 8/24
 
** I&C and DC power cables pulls today 8/24
Line 25: Line 25:
 
** Other kicker flanges (back)ordered 1-2 weeks lead time
 
** Other kicker flanges (back)ordered 1-2 weeks lead time
  
* DAQ jobs
+
* DAQ to-do's
 
** Chris complete rack, move to Mech Room
 
** Chris complete rack, move to Mech Room
 
** Brad put DAQ on network
 
** Brad put DAQ on network
Line 32: Line 32:
 
** Bryan - work with Gary for soft ioc and Brad to activate network port
 
** Bryan - work with Gary for soft ioc and Brad to activate network port
  
* Greg's jobs
+
* Greg's to-do's
 
** compute integrated asymmetry
 
** compute integrated asymmetry
 
** use slurm to run jobs on farm
 
** use slurm to run jobs on farm

Latest revision as of 19:20, 24 August 2022

Thursday's @ 9am EDT by Zoom

New UITFList entries

Last Week's Action Items

  • Sandesh/Probir to-do's
    • Follow-up with EMC re-making coil
    • Tally list of jobs once magnet on-site
  • Gary's to-do's
    • extend spool and support two locations
    • relocate table further downstream
    • layout modifications for lead wall with hole => Al covers dropped off w/ Vince + Joe submit sho pjob
    • check stand status at mech. shop => most of stand picked up, waiting on top plate + rails
  • Joe's to-do's
    • Circuit installed 8/22
    • I&C and DC power cables pulls today 8/24
    • 6" reducers ordered 1-2 weeks
    • Flanges for spool on-hand
    • Other kicker flanges (back)ordered 1-2 weeks lead time
  • DAQ to-do's
    • Chris complete rack, move to Mech Room
    • Brad put DAQ on network
    • Riad/Chris decide order Triax adapters, tell Keith/Chris how you want triax terminated at UITF
    • Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
    • Bryan - work with Gary for soft ioc and Brad to activate network port
  • Greg's to-do's
    • compute integrated asymmetry
    • use slurm to run jobs on farm
    • simulate 5 configurations

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

Documentation