Difference between revisions of "PQB Meeting September 10, 2015"

From Ciswikidb
Jump to navigation Jump to search
 
(11 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
# Ed Folts: Hall A beamline progress report
 
# Ed Folts: Hall A beamline progress report
 
# Jay Benesch: CEBAF Injector Upgrade
 
# Jay Benesch: CEBAF Injector Upgrade
## Original Accelerator Improvement Project (AIP) Charter (2010): [[media:INJ_Full_Energy_Injector_Upgrade_charter.docx]]
+
## Original Accelerator Improvement Project (AIP) Charter (2010): [[media:INJ_Full_Energy_Injector_Upgrade_charter.pdf]] [[media:INJ_Full_Energy_Injector_Upgrade_charter.docx]]
 
## Joe Grames, ''Considerations for CEBAF Injector Upgrade'': [[media:150824_Upgrade_Grames.pdf]]
 
## Joe Grames, ''Considerations for CEBAF Injector Upgrade'': [[media:150824_Upgrade_Grames.pdf]]
 
## Jay Benesch, ''Advanced Injector'': [[media:advanced_injector_PQB_10sep2015.pdf]]
 
## Jay Benesch, ''Advanced Injector'': [[media:advanced_injector_PQB_10sep2015.pdf]]
Line 23: Line 23:
  
 
* Hall A progress report:
 
* Hall A progress report:
# Modulation coils are in the right place. All work is complete and ready for test.
+
# Modulation coils are in their right place. All work is complete and ready for test.
 
# There is plan to install the lumi detectors in Hall A beamline exit pipe.
 
# There is plan to install the lumi detectors in Hall A beamline exit pipe.
 
# Cables for cavities on orders and will be pulled once they arrive.
 
# Cables for cavities on orders and will be pulled once they arrive.
 
# Working on installing the XYQ cavity set.
 
# Working on installing the XYQ cavity set.
# Halo ladder installed with QWeak targets and detector table in place. Need to:
+
# Halo ladder installed with its QWeak targets and detector table is in place. Still Need to:
## Re-design new targets and
+
## Re-design new targets
## Pull cables (signal + HV) for the halo detectors
+
## Install Qweak halo detectors
 +
## Pull cables (signal + HV) for the halo detectors.
 +
 
 +
 
 +
* CEBAF Injector Upgrade:
 +
# The new Quarter Cryo Module (QCM) will be installed and commissioned in the new Upgrade Injector Test Facility (UITF) in June 2016.
 +
# Chopper maybe needed to clean the longitudinal space of the beam.
 +
# We need to prepare a summary of PQB issues related to the injector. For each problem: symptoms, how it was measured or studied, and if a cause was found or suspected.

Latest revision as of 09:24, 11 September 2015

We will meet in TL 2236 Thursday September 10 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Ed Folts: Hall A beamline progress report
  2. Jay Benesch: CEBAF Injector Upgrade
    1. Original Accelerator Improvement Project (AIP) Charter (2010): media:INJ_Full_Energy_Injector_Upgrade_charter.pdf media:INJ_Full_Energy_Injector_Upgrade_charter.docx
    2. Joe Grames, Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
    3. Jay Benesch, Advanced Injector: media:advanced_injector_PQB_10sep2015.pdf




Notes from this meeting:

  • Hall A progress report:
  1. Modulation coils are in their right place. All work is complete and ready for test.
  2. There is plan to install the lumi detectors in Hall A beamline exit pipe.
  3. Cables for cavities on orders and will be pulled once they arrive.
  4. Working on installing the XYQ cavity set.
  5. Halo ladder installed with its QWeak targets and detector table is in place. Still Need to:
    1. Re-design new targets
    2. Install Qweak halo detectors
    3. Pull cables (signal + HV) for the halo detectors.


  • CEBAF Injector Upgrade:
  1. The new Quarter Cryo Module (QCM) will be installed and commissioned in the new Upgrade Injector Test Facility (UITF) in June 2016.
  2. Chopper maybe needed to clean the longitudinal space of the beam.
  3. We need to prepare a summary of PQB issues related to the injector. For each problem: symptoms, how it was measured or studied, and if a cause was found or suspected.