Difference between revisions of "May 3, 2019"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We'll meet in TL-1227 on Friday May 3 @ 11am. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-88...")
 
Line 7: Line 7:
 
  Moderator ID: 2864
 
  Moderator ID: 2864
  
;Schedule
+
;SAD and Summer Run Schedule
 
*Today through summer run
 
*Today through summer run
 +
*Steve's SAD calendar - https://accweb.acc.jlab.org/calendar/
 +
*List of ATLIS tasks - https://wiki.jlab.org/ciswiki/index.php/Spring_SAD_2019
  
 
;Pre-Beam Jobs
 
;Pre-Beam Jobs
Line 14: Line 16:
 
*Helicity board configuration
 
*Helicity board configuration
 
*PQB laser configuration
 
*PQB laser configuration
 +
*Activate photocathode & QE scan
 +
*Configure for anode bias
  
;Beam Jobs
+
;Beam Jobs to FC#1
 +
* Pick all save for restoration, move to new spot, restore orbit
 +
* Set photocathode rotation (few access to roll puck, then PQB measurement to where? to finalize orientation)
 +
* Study and then fix anode bias for 0V, 500V, 1000V (TOF using chopper, beam size or emittance scan using solenoids)
 +
* ABC transmission setup w/ which? flipper choice (either makes transverse polarization) + HWien ~ 16 deg.
 +
* What PQB beam measurements to make?
  
 +
;Beam Jobs to FC#2
 +
* Initial restoration to FC#2
 +
* Carry on w/ ABC setup (finalize flipper choice here, maybe?)
 +
* Mott measurement to precisely finalize spin rotators (VWien and Solenoids)
 +
* Iterate w/ ABC setup, to FC#2
 +
* What PQB beam measurements to FC2 (can be high current)
  
 +
;Beam Jobs to ILD, and beyond...
 +
* Initial restoration to ILD
 +
* Scaling RF and injector magnets, energy/injector beam setup
 +
* Complete ABC setup to ILD
 +
* M56/PQB measurement to ILD?
 +
 +
;Beam to Halls
 +
* What is prioritize/sequence for jobs, e.g. when does spin dance happen?
  
 
;Punchlist
 
;Punchlist
 +
*FC2 air cylinder needs to be replaced
 
*Regular RTP rise time procedure (how often?, as-is manual or automated?)
 
*Regular RTP rise time procedure (how often?, as-is manual or automated?)
 +
*Insertable lens (is alarm sufficient, or disconnect IN/OUT control?)

Revision as of 08:52, 2 May 2019

We'll meet in TL-1227 on Friday May 3 @ 11am.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 693750184#
Meeting URL: https://bluejeans.com/693750184
Moderator ID: 2864
SAD and Summer Run Schedule
Pre-Beam Jobs
  • Laser configuration (ABCD)
  • Helicity board configuration
  • PQB laser configuration
  • Activate photocathode & QE scan
  • Configure for anode bias
Beam Jobs to FC#1
  • Pick all save for restoration, move to new spot, restore orbit
  • Set photocathode rotation (few access to roll puck, then PQB measurement to where? to finalize orientation)
  • Study and then fix anode bias for 0V, 500V, 1000V (TOF using chopper, beam size or emittance scan using solenoids)
  • ABC transmission setup w/ which? flipper choice (either makes transverse polarization) + HWien ~ 16 deg.
  • What PQB beam measurements to make?
Beam Jobs to FC#2
  • Initial restoration to FC#2
  • Carry on w/ ABC setup (finalize flipper choice here, maybe?)
  • Mott measurement to precisely finalize spin rotators (VWien and Solenoids)
  • Iterate w/ ABC setup, to FC#2
  • What PQB beam measurements to FC2 (can be high current)
Beam Jobs to ILD, and beyond...
  • Initial restoration to ILD
  • Scaling RF and injector magnets, energy/injector beam setup
  • Complete ABC setup to ILD
  • M56/PQB measurement to ILD?
Beam to Halls
  • What is prioritize/sequence for jobs, e.g. when does spin dance happen?
Punchlist
  • FC2 air cylinder needs to be replaced
  • Regular RTP rise time procedure (how often?, as-is manual or automated?)
  • Insertable lens (is alarm sufficient, or disconnect IN/OUT control?)