− | ;Planning | + | ;Planning |
* [https://accweb.acc.jlab.org/calendar/ SAD Calendar] | * [https://accweb.acc.jlab.org/calendar/ SAD Calendar] | ||
*[[media:190501_GunUpgradeJobs.docx]] | *[[media:190501_GunUpgradeJobs.docx]] | ||
Line 5: | Line 5: | ||
*[[Gun2 Load Lock Chamber Replacement]] | *[[Gun2 Load Lock Chamber Replacement]] | ||
− | ;Beam Studies | + | ;Summer Beam Studies |
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics] | ||
*Bias anode [[media:190815_life.pptx]] | *Bias anode [[media:190815_life.pptx]] |
Revision as of 11:58, 19 September 2019
- Planning
- SAD Calendar
- media:190501_GunUpgradeJobs.docx
- media:30July2019_KryptonLine.pptx
- Gun2 Load Lock Chamber Replacement
- Summer Beam Studies
- 200 kV Gun Tasks
- S&A job for new small shed going into CEBAF
- ATLIS to remove small shed from UITF and prep for CEBAF
- Gun2 200kV cathode, 10kV anode, kr plumbing
- Pete's BPM Atlis
- CEBAF Kr Gas HV Conditioning
- Logbook entry of 200 kV cathode assembly
- Testing CEBAF w/ 200 keV beam
- SAD Tasks
- Upgrade the loading chamber
- Upgrade fiber laser connectors req 1 req 2
- Remove oil tank
- Install 2nd decarad unit*Remove, inspect, install FC2
- PQB - SAD & CREX