Difference between revisions of "Fall SAD 2019"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
;SAD Schedule and Beam Resstoration | ;SAD Schedule and Beam Resstoration | ||
− | [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18799 Cathode Rotation/Alignment for CREX] | + | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18799 Cathode Rotation/Alignment for CREX] |
+ | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19679 post-PREX II QE and AP measurements] | ||
* [https://accweb.acc.jlab.org/calendar/ SAD Calendar] | * [https://accweb.acc.jlab.org/calendar/ SAD Calendar] |
Revision as of 06:55, 10 September 2019
- Pre-planning for Aug-Nov SAD 2019
- media:190501_GunUpgradeJobs.docx
- media:30July2019_KryptonLine.pptx
- Gun2 Load Lock Chamber Replacement
- Beam studies before SAD begins
- Gun2 HV chamber jobs
- S&A job for new small shed going into CEBAF
- ATLIS to remove small shed from UITF and prep for CEBAF
- Gun2 200kV cathode, 10kV anode, kr plumbing
- Pete's BPM Atlis
- CEBAF Kr Gas HV Conditioning
- Gun2 Load chamber jobs
- Laser jobs
- Make beam again jobs
- Activate a photocathode
- Remove, inspect, install FC2
- Testing CEBAF w/ 200 keV beam
- AIPINJ
- Last SAD before upgrade
- Walk throughs and measurements
- Remove oil tank
- SAD Schedule and Beam Resstoration