Difference between revisions of "Wednesday August 7, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 36: Line 36:
 
  and it costs $10,000 each.  
 
  and it costs $10,000 each.  
 
  - Electron Dump: isolated to measure beam current, 2 kW
 
  - Electron Dump: isolated to measure beam current, 2 kW
  - BCM0L02 and Electron Dump in Beam Loss Accounting (BLA)
+
  - Plan to have both BCM0L02 and Electron Dump in Beam Loss Accounting (BLA)
 
  - The photon Cu collimator has a hole of 1.0 cm diameter
 
  - The photon Cu collimator has a hole of 1.0 cm diameter
 
  - The only Fast Valve in the Injector is located just downstream of the Injector Gate (VFV0L04).
 
  - The only Fast Valve in the Injector is located just downstream of the Injector Gate (VFV0L04).

Revision as of 11:14, 9 August 2013

We will meet in TED 2561B on Wednesday August 7 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

 media:Meeting_7August_2013.pdf
 media:Meeting_7August_2013.pptx  

1- Bubble Chamber progress at Argonne

2- Beam Heating in Cu Radiator media:Beam_Heating_in_Cu_Radiator.pptx media:Beam_Heating_in_Cu_Radiator.pdf

3- Beamline Layout

4- Bubble Chamber cost estimate: procurement and labor

5- Background from 17O(γ,n)16O and subsequent neutron elastic scattering with 16O and 14N nuclei

6- Background from 13C(γ,n)12C (in case we decide to use CO2 instead of N2O)



Notes from this meeting:

  • Beamline Layout:
- Need a Faraday Cup on the Bubble Chamber beamline, after the second BPM and before the radiator
- On the main beamline, FC2 is a 1 kW dump (200 µA and 5 MeV)
- PEPPo took positron data with Quads OFF and electron data with Quads ON
- What is the trip limit of the Fast Valve and how fast is it?
- The Bubble Chamber experiment needs electron beam with KINETIC ENERGY = 8.5 MeV
- At Jefferson Lab, an egress has a minimum clearance of 36 inches
- We can use two Super Harps instead of the two Quads. Unfortunately, the accelerator does not have Super Harps, 
and it costs $10,000 each. 
- Electron Dump: isolated to measure beam current, 2 kW
- Plan to have both BCM0L02 and Electron Dump in Beam Loss Accounting (BLA)
- The photon Cu collimator has a hole of 1.0 cm diameter
- The only Fast Valve in the Injector is located just downstream of the Injector Gate (VFV0L04).
- Fast Valve closes in 30 ms and comes with it own vacuum gauge that can be installed separately on the beamline.
 The valve and its electronics cost $10,000 
  • Cost:
- Procurement overhead is 25% and for labor it is 1.50
  • Simulations and Backgrounds:
-