Data Acquisition System
DAQ Hardware
- Electronic Map of Mott Crates (February 12, 2014):
Media:ElectronicsMap_Feb122014.pdf
Media:ElectronicsMap_Feb122014.pptx
- Cabling of FADC, Scalers, and TDC (February 12, 2014):
- DAQ Timing (February 12, 2014):
Media:DAQ_Timing_Feb122014.pdf
Media:DAQ_Timing_Feb122014.pptx
DAQ Software
Manuals and References
- CAEN VME Crate Manual - VME8200 9U 21Slot (VME64x backplane with no P0 connector) media:VME8200_Manual.pdf
To-do List
# Fix evio with file size > 2 GB. Now decoder is limited to 900k events. # Update MottOnline # Add BPM Analysis 4- Replace "PEPPo" with "Mott" in scripts, decoder, ... . 5- Add delayed helicity analysis for Mott_Sample and Mott_SemiInt Modes. Delayed analysis is already included for Scalers and PEPPo_Int Modes.
6- Upgrade from MVME6100/VxWorks to Intel/Linux CPU. /opt/coda/sbcmdaq0. 7- Add Block Readout
8- At one time, we used minicom to hard reboot the Mott DAQ VME crate. This service was discontinued. Instead, we will use the RS232 connection on the CAEN VME64X VME8200. 9- Upgrade opsmdaq0. 10- Standardize "msql" on opsmdaq0.