Data Acquisition System
Jump to navigation
Jump to search
DAQ Hardware
- Electronic Map of Mott Crates (May 06, 2014):
Media:ElectronicsMap_May062014.pdf
Media:ElectronicsMap_May062014.pptx
- Cabling of FADC, Scalers, and TDC (February 12, 2014):
- DAQ Timing (February 12, 2014):
Media:DAQ_Timing_Feb122014.pdf
Media:DAQ_Timing_Feb122014.pptx
DAQ Software
Manuals and References
- Jefferson Lab Data Acquisition Group CODA Wiki [1]
- CAEN VME Crate Manual - VME8200 9U 21Slot (VME64x backplane with no P0 connector) media:VME8200_Manual.pdf
To-do List
* Repair or replace bad connection at patch panel of detector signals coming from downstairs
* Analysis List:
- Add delayed helicity analysis for Mott_Sample and Mott_SemiInt Modes. Delayed analysis is already included for Scalers and PEPPo_Int Modes.
- Add BPM Analysis
- Modify decoder for the updated Mott_SemiInt mode. Started: /work/idaq/Mott/Analysis/1, Runs: 7642, 7672.
- Update MottOnline
- Replace "PEPPo" with "Mott" in scripts, decoder, ... .
* Things to do to speed up the DAQ and reduce deadtime:
- Use the new SemiIntFast Mode:
- Upgrade the time-of-flight readout to the FADC TDC mode
- Upgrade the scalers readout to the FADC Scaler mode
- Add Block Readout
- Reduce the Mott Trigger rate by rejecting low energy electrons or dump events:
- Increase E-detector discriminator thresholds
- Veto dump events using beam timing signal