Phase 1
Jump to navigation
Jump to search
Bluejeans Links
- Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
- Daily 3:30pm shift turn over meeting => https://bluejeans.com/629943812
Commissioning Plans
- Joe's checklist media:210401_Phase1_Commissioning.docx
- Reza's checklist media:BeamINJphase1v5.pptx
- Phase 1 Commissioning ATLIS tasks
- Phase 1 Commissioning Schedule
Quick Links
- MCC Phone Numbers: 7046, 7047, 7048, 7049, 7877, 7878
- Quick reference, Rev17beta, Draft 5 media:12GeV_injector_quick_reference_rev17_DRAFT-5.pdf
- Phase I Beam Commissioning ATLis: 22060
- Injector Procedures Workspace
Handy documents
- 5/4/21 Phase 1 Settings for 130kV media:UIPhase1Settings130kV_2021.pdf
- 3/16/21 Beam Drivers Meeting Slides media:BeamDrivers_Pt2_3.16.21.pdf
- 1/25/21 Beam Drivers Preliminary Meeting
Installation
- AIPINJ - Upgrade Meetings
- Phase 1 Beamline Components
- Phase 1 Installation ATLIS
- Phase 1 & SAD ATLIS Tasks
- CIS Phase 1 work plans
- Phase 1 System Readiness
Documentation
- AIPINJ - Sharepoint (3D models, drawings, data)
- AIPINJ - Layouts
- AIPINJ - S&A Transmittals
- AIPINJ - CED
- Injector Upgrade Documents and Links
- ATLis Testplans (click Expand button =>)
- General / Catch-All Test Plans
- 22060 Beam Commissioning AIPINJ Phase I (general ATLis)
- 21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)
- With-Beam Hardware Commissioning Test Plans
- 22441 Commissioning V-Wien, H-Wien, Spin Flipper Solenoids and Autosteer Knobs
- 22061 PSS Kicker Tests @ 130keV & 200keV
- 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration
- 22082 AIPINJ: 130/200 keV lifetime measurements
- 22313 Compare Beam Transmission for Gun Biased at 130 and 200kV
- Beam Commissioning
- 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup
- 22181 Early Injector Orbit Data Collection Rev. April/May 2021
- 22182 Set up beam from PCup to FC1 at 130keV
- 22183 Beam steer from FC1 to FC2
- 22184 Efficacy of Knobs chosen for spot move correction
- Optics/RF Test Plans
- 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning
- 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning
- 19784 Test multiwire emittance measurement with beam
- 22160 Measure optics at various coil fixture rotation angles for MDR1I02
- 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers
- 22250 0I02 Viewer vs Harp Emittance Measurement
- Spin/Wien Test Plans
- 22090 Mott Hot Checkout
- 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator
- 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion
- 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)
- 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien
- 22330 Measuring time of flight to chopper master slit versus Wien spin angle
- Parity Quality Beam Test Plans