Wednesday July 24, 2013

From Ciswikidb
Jump to navigation Jump to search

We will meet in TED 2561B on Wednesday July 24 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

 media:Meeting_24July_2013.pdf
 media:Meeting_24July_2013.pptx  

1- Schedule

2- Design of beamline, radiator and dump

  • Experiment beam line today is presently decommissioned, ready for modification:
5D beam line

3- Bubble Chamber work at Argonne

4- Background and simulation

5- Absolute beam energy

6- Safety



Notes from this meeting:

- The power deposited in the radiator for 200 uA and 8.5 MeV electron beam:
  For 0.02 mm radiator, average energy loss is 24 keV, P = 4.8 W
  For 0.10 mm radiator, average energy loss is 120 keV, P = 24 W
- Need a HARP in the new Bubble Chamber line to measure the size of the beam impinging on the radiator