AIPINJ Layouts
Jump to navigation
Jump to search
Overall Layouts
Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- July 19, 2019 media:keytotaljuly19.pdf
- July 17, 2019 media:keytotaljuly17.pdf
Gun Layouts
- Feb 26, 2020 media:BEAMLINELAYOUTFEB26.pdf edits post ME meeting, small corrections
- -sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
- -remove the pink rectangular placeholders for quadrupoles
- -sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
- -restore gap between the FG solenoids as exists in tunnel today
- -sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
- -if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
- Feb 07, 2020 media:beamlinelayoutfeb07.pdf edits post ME meeting, small corrections
- Feb 04, 2020 media:BEAMLINELAYOUTFEB04.pdf edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
- Jan 31, 2020 media:200203_layout.pdf major revision, for functionality to setup the beam line
- Jan 22, 2020 media:layout01232020.pdf move 2nd lens to accomodate 2-3/4" or 4-1/2" window
- Jan 15, 2020 media:200115_gun2chopper.pdf restore MFA0I03 and MFA0I05 to beam line
- Jul 17, 2019 media:gunthroughchopperjuly17.pdf
- Jun 13, 2019 media:190613_guntochopper.pdf
Chopper Layouts
- chopper assembly media:190606_chopper_assembly_drawing.pdf
Booster Layouts
Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- Sep 26, 2019 media:190926_boosterregion.pdf
- -QCM was .32" further downstream. so all those interfaces moved.
- -distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
- -buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
- -YAO cavity was .37" longer than the design drawing.
- July 17, 2019 media:chopperthroughmodulejuly17.pdf
- June 10, 2019 media:190610_layoutjune10.pdf
Warm-RF Drawings
- prebuncher cavity media:190613_prebuncher.pdf
- buncher cavity media:190815_CEBAF_BUNCHER.pdf
- chopper RF cavity media:Haimson_chopper_cavities.pdf
SRF Drawings
- drawing from Jim Henry media:CRM1107001-0001_-_PDF_1.pdf