AIPINJ Layouts
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Existing April 2020 Injector Layout
- Existing April 2020 injector quick reference (thanks, Daniel!) : media:12GeV_injector_quick_reference_rev16.pdf
Overall Layouts
Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- July 19, 2019 media:keytotaljuly19.pdf
- July 17, 2019 media:keytotaljuly17.pdf
Gun Layouts
- Mar 26, 2020 media:beamlinelayoutmarch26.pdf
- Mar 09, 2020 media:BEAMLINELAYOUTMAR09.pdf 90% complete layout; note bellows on A1/A2 girder
- Feb 26, 2020 media:BEAMLINELAYOUTFEB26.pdf edits post ME meeting, small corrections
- -sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
- -remove the pink rectangular placeholders for quadrupoles
- -sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
- -restore gap between the FG solenoids as exists in tunnel today
- -sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
- -if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
- Feb 07, 2020 media:beamlinelayoutfeb07.pdf edits post ME meeting, small corrections
- Feb 04, 2020 media:BEAMLINELAYOUTFEB04.pdf edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
- Jan 31, 2020 media:200203_layout.pdf major revision, for functionality to setup the beam line
- Jan 22, 2020 media:layout01232020.pdf move 2nd lens to accomodate 2-3/4" or 4-1/2" window
- Jan 15, 2020 media:200115_gun2chopper.pdf restore MFA0I03 and MFA0I05 to beam line
- Jul 17, 2019 media:gunthroughchopperjuly17.pdf
- Jun 13, 2019 media:190613_guntochopper.pdf
Chopper Layouts
- chopper assembly media:190606_chopper_assembly_drawing.pdf
Booster Layouts
Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- Sep 26, 2019 media:190926_boosterregion.pdf
- -QCM was .32" further downstream. so all those interfaces moved.
- -distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
- -buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
- -YAO cavity was .37" longer than the design drawing.
- July 17, 2019 media:chopperthroughmodulejuly17.pdf
- June 10, 2019 media:190610_layoutjune10.pdf
Warm-RF Drawings
- prebuncher cavity media:190613_prebuncher.pdf
- buncher cavity media:190815_CEBAF_BUNCHER.pdf
- chopper RF cavity media:Haimson_chopper_cavities.pdf
SRF Drawings
- drawing from Jim Henry media:CRM1107001-0001_-_PDF_1.pdf