Phase 1 - HCO & Commissioning
CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30)
- 4/19/21 - Updated punchlist media:210419_CIS_HCO.docx
- 4/06/21 - Updated punchlist media:210406_CIS_HCO.docx
- 3/22/21 - Updated punchlist media:210322_CIS_HCO_v2.docx
I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)
- I&C Jobs
- What to expect in tunnel?
- Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
- There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
- Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)
* BPMs = Pete estimates 1 person x 5 days for all of the BPM hook-up and pre-beam checkout jobs
- 10 total - all unrotated
- 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
- 7 old style => 5.5" long end tapped
- Viewers
- 8 total - all chromox except ITV0I02 (YAG)
- Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
- Crash inhibit #2 : ITV0I02 and Harp IHA0I02
- Harps
- 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
- Wien HV
- Tony status update
* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)
- 3 total - same as before (PCUP, A1, A2)
- PCUP identical as before, just a new location
- A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
- A2 current monitoring as before, linear bellows manual as before; has 3 stop positions. Used by PSS group for kicker
- Valves
- 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
- Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
- Beam line valve - VBV1I07 (same name), same all metal gate valve
- Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
- All 3 valves tied to UHV vacuum fault (100 uA limit)
- Ion pumps
- Marcy's final list media:210209_ion pump names.xlsx
- Software Jobs
- CED
- Michele or Gary can gives us an update
- Apps
- Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
- Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
- Screens
- I guess many screens auto-updated from CED, that's great
- Like with apps, will need name review; I guess system owners look at their own screens for oddities?
- What else for software?
Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)
- DC/Magnet Jobs
- Spreadsheet updated 3/15 media:210315_Phase1_Magnet_Summary.xlsx
- Updated MHD field map due from JM/LL to GC
- Updated MFX (SW/CW) field map due from RS to GC
- Spreadsheet updated after further feedback media:210301_Phase1_Magnet_Summary_v3.xlsx
- Spreadsheet updated at 3/1 SAD planning meeting media:210301_Phase1_Magnet_Summary_v2.xlsx
- Spreadsheet initially media:210301_Phase1_Magnet_Summary.xlsx
- Software Jobs
- CED
- Apps
- Screens
- What else for software?
- Other magnet jobs
- (JM) Complete magnet table I circulated
- Done(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
- (RS/GC) FG solenoid special hysteresis for Gary
- (RS/MJ) Magnet info for Inj Steer spin calculations
- (JM/JG) Decision on spare DR fabrication and alignment
- Done (LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
- Done (LL/JM) Second QW measurement, what's the scope here?
- Done (JM) When is the rotating coil stand ready?
- (JM/LL) Reconciling MHD discrepancy
- (LL) Report on QW
- (LL) Report on HD
- (LL) Report on PSS kicker
System Readiness / HCO Schedule (April '21)
For detailed plans for a given day and week, discussed at 830 toolbox meeting every weekday, see CIS Phase 1 work plans
Format: time: System (# of people)
Updated 4/22
April/May | Mon | Tue | Wed | Thu | Fri | Sa | Su |
---|---|---|---|---|---|---|---|
12th - 16th | Morning: Valve Controls (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: Valve Controls (1x) Morning: ItoV, Pico, FSD (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: Valve Controls (1x) Morning: ItoV, Pico, FSD (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: ItoV, Pico, FSD (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: ItoV, Pico, FSD (1x) Afternoon: Magnet Hook-Ups (2x) |
Magnet Hook-Ups (2x) | Magnet Hook-Ups (2x) |
19th - 23rd | Morning: BPMs (1x) Morning: Viewers (1x) Morning: Harps (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: BPMs (1x) Morning: Viewers (1x) Morning: Harps (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: BPMs (1x) Morning: Viewers (1x) Morning: Harps (1x) Afternoon: Magnet Hook-Ups (2x) |
Morning: Diagnostics Hook-ups as possible; Leak Checks (CIS) Bake Prep (all) Afternoon: Leak Checks Bake Prep (CIS) |
Morning: Diagnostics Hook-ups as possible Bake Prep (all) Afternoon: Bake Prep (all) |
Magnet Hook-Ups/HCO (2x)? |
Magnet Hook-Ups/HCO (2x)? |
26th - 30th | PCup-A1-region Bake Opportunistic Hook-ups as possible |
PCup-A1-region Bake Opportunistic Hook-ups as possible |
PCup-A1-region Bake Opportunistic Hook-ups as possible |
PCup-A1-region Bake Opportunistic Hook-ups as possible |
PCup-A1-region Bake Opportunistic Hook-ups as possible |
Magnet HCO (2x)? | Magnet HCO (2x)? |
3rd - 7th | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
10th - 14th | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
- BPM = Francis
- Valve Controls = Ketchum
- ItoV, Picoammeters, Gun FSD Interlocks = Francis
- Viewers = Norris
- Harps = Dela Cruz
- Magnet / DC Power = Coleman
- 2B Alignment = S&A, Gould
- PSS = Kowal
Beam Commissioning Planning
Documents, Links, Important Dates
Links:
Documents:
- 3/16/21 Beam Drivers Meeting Slides media:BeamDrivers_Pt2_3.16.21.pdf
- Injector Group Beam Commissioning Slides File:BeamINJphase1v5.pptx
- Commissioning Checklist (Grames) File:210401 Phase1 Commissioning.docx
- (incomplete / in-progress) Commissioning Checklist, ATLiss added File:210407 Phase1 Commissioning.docx
- Preliminary Commissioning Test Plan Layout File:3.31.21 BeamCommissioningPlanLayout AIPINJ-1 firstpass.ods
Dates: updated 4/7/21
- Finalize commissioning plan: April 5th
- Injector HCO/SR Complete: 5/2
- Injector Beam Commissioning Begins: 5/3
- NL/Inj -> Stable 2K: 5/21
- Full CEBAF PSS Certification: 5/24 - 6/11
- End of SAD: 7/2
- Resumption of Physics: Mid-August
ATLis Testplans
updated 4/7/21
General / Catch-All Test Plans
- 22060 Beam Commissioning AIPINJ Phase I (general ATLis)
- Injector Upgrade - Phase 1 Installation (Gun to Chopper)
With-Beam Hardware Commissioning Test Plans
- 22061 PSS Kicker Tests @ 130keV & 200keV
- 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration
- 22082 AIPINJ: 130/200 keV lifetime measurements
- Transmission vs Gun HV
Beam Commissioning
- 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup
- 22181 Early Injector Orbit Data Collection Rev. April/May 2021
- 22182 Set up beam from PCup to FC1 at 130keV
- 22183 Beam steer from FC1 to FC2
- 22184 Efficacy of Knobs chosen for spot move correction
Optics/RF Test Plans
- 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning
- 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning
- 19784 Test multiwire emittance measurement with beam
- 22160 Measure optics at various coil fixture rotation angles for MDR1I02
- 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers
Spin/Wien Test Plans
- 22090 Mott Hot Checkout
- 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator
- 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion
- 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)
- 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien
- Beam ToF vs Wien Setting, 130keV and 200keV
Parity Quality Beam Test Plans
Beam Commissioning Schedule
Beam Commissioning Week #1? -- (4/23): Earliest possible start date for beam commissioning is 5/10. May slide.
DAY Shift | Monday 5/10 |
Tuesday 5/11 |
Wednesday 5/12 |
Thursday 5/13 |
Friday 5/14 |
Sat 5/15 |
Sun 5/16 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
pre-beam checks Gun->Chopper Commissioning @ 130keV, TM (22180) |
Gun->Chopper Commissioning @ 130keV, TM (22180) | PSS Kicker Cert (22061) PCup -> FC1 @130keV, TM (22182) |
PCup -> FC1 @130keV, TM (22182) | PCup -> FC1 @130keV, CW (22182) /or\ Spot Move Knobs (22184) |
Beam Off | Beam Off | With-beam HCO of all hardware up to 1D; TM setup to FC1/1D, including element centering, correcting for gun kick; Early Injector Orbit Data Collection; Spot move knobs; CW Setup to FC1? |
Scientist #1 | Beam Off | Beam Off | ||||||
Scientist #2 | Beam Off | Beam Off | ||||||
Ops Inj Support | Forman | Moser | Forman | Forman | Forman | Beam Off | Beam Off | |
SSO / AM Sweeper | Carlino / Jones | Carlino / Jones | Carlino / Jones | Carlino / Jones | Carlino / Jones | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | |||
SWING Shift | 5/10 | 5/11 | 5/12 | 5/13 | 5/14 | 5/15 | 5/16 | |
Beam Commissioning Plan / ATLis | Gun->Chopper Commissioning @ 130keV, TM (22180) | Gun->Chopper Commissioning @ 130keV, TM (22180) | PCup -> FC1 @130keV, TM (22182) | PCup -> FC1 @130keV, TM (22182) Early Injector Orbit Data (22181) |
PCup -> FC1 @130keV, CW (22182) /or\,Spot Move Knobs (22184) |
Beam Off | Beam Off | |
Scientist #1 | Beam Off | Beam Off | ||||||
Scientist #2 | Beam Off | Beam Off | ||||||
Ops Inj Support | Law | Law | Law | Law | Law | Beam Off | Beam Off | |
SSO | Deir | Deir | Deir | Deir | Deir | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | ||||||||
CCOC / PD | Aiken (both) | Aiken | Merz / Aiken | Merz / Aiken | Merz / Aiken | Merz / Aiken | Merz / Aiken |
Beam Commissioning Week #2
DAY Shift | Monday 5/17 |
Tuesday 5/18 |
Wednesday 5/19 |
Thursday 5/20 |
Friday 5/21 |
Sat 5/22 |
Sun 5/23 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plan (ATLis) |
PCup -> FC1 @130keV, CW (22182) /or\ Spot Move Knobs (22184) |
PCup -> FC1 @130keV, CW (22182) PCup vs Gun HVPS Current Cal (22080) |
Warm RF Setup @130keV (22190) | MDR1I02 Optics vs Rotation (22160) | 0I02-YAG Emittance Measurement (22250) | Beam Off | Beam Off | CW Setup to FC1/1D; Warm RF CW Setup; 1I-0I-region Optics measurements; Lifetime measurement? |
Scientist #1 | Beam Off | Beam Off | ||||||
Scientist #2 | Beam Off | Beam Off | ||||||
Ops Inj Support | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | Beam Off | Beam Off | |
SSO / AM Sweeper | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Gauthier / Moser | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | NL PSS Commissioning, SSG, +2 | |||
SWING Shift | 5/17 | 5/18 | 5/19 | 5/20 | 5/21 | 5/22 | 5/23 | |
Beam Commissioning Plan / ATLis | PCup -> FC1 @130keV, CW (22182) | Warm RF Setup @130keV (22190) | Warm RF Setup @130keV (22190) | 1I-0I-region qsUtility @130keV (21923) | 1I-0I-region qsUtility @130keV (21923) Lifetime Measurement @ 130keV (22082) |
Beam Off | Beam Off | |
Scientist #1 | Beam Off | Beam Off | ||||||
Scientist #2 | Beam Off | Beam Off | ||||||
Ops Inj Support | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | Beam Off | Beam Off | |
SSO | Anthony | Anthony | Anthony | Anthony | Anthony | Beam Off | Beam Off | |
Other MCC Work, Group, +Persons in MCC | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | NL Lock-Up/Commissioning, SSG, +2 | Beam Off | Beam Off | |
CCOC / PD | Merz / Aiken | Merz / Aiken | Merz / Frierson | Merz / Frierson | Merz / Frierson | Merz / Frierson | Merz / Frierson |
CEBAF PSS Certifications
Beam Commissioning Week #3
DAY Shift |
Monday 5/24 |
Tuesday 5/25 |
Wednesday 5/26 |
Thursday 5/27 |
Friday 5/28 |
Sat 5/29 |
Sun 5/30 |
Notes/Goals |
---|---|---|---|---|---|---|---|---|
Beam Commissioning Plans (ATLis) |
TBD | TBD | TBD | TBD | TBD | Beam Off? / TBD | Beam Off? / TBD | Beam Commissioning on Day Shift ONLY during the week. Weekend? |
Scientist #1 | Beam Off? / TBD | Beam Off? / TBD | ||||||
Scientist #2 | Beam Off? / TBD | Beam Off? / TBD | ||||||
Ops Inj Support | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | TBD: {Forman, Law, Moser} | Beam Off? / TBD | Beam Off? / TBD | |
SSO / AM Sweeper | Garcia / Moser | Garcia / Moser | Garcia / Moser | Garcia / Moser | Garcia / Moser | Beam Off? / TBD | Beam Off? / TBD | |
Other MCC Work, Group, +Persons in MCC | Beam Off? / TBD | Beam Off? / TBD | ||||||
SWING Shift | 5/24 | 5/25 | 5/26 | 5/27 | 5/28 | Beam Off? / TBD | Beam Off? / TBD | |
PSS CERTIFICATION | PSS Certification | PSS Certification | PSS Certification | PSS Certification | PSS Certification | Beam Off? / TBD | Beam Off? / TBD | |
PSS Test Director | TBD Crew Chief | TBD Crew Chief | TBD Crew Chief | TBD Crew Chief | TBD Crew Chief | Beam Off? / TBD | Beam Off? / TBD | |
CCOC / PD | Merz / Frierson | Merz / Frierson | Carlino / Frierson | Carlino / Frierson | Carlino / Frierson | Carlino / Frierson | Carlino / Frierson |