Meeting 8/24/22 - COMTRA

From Ciswikidb
Revision as of 20:16, 24 August 2022 by Grames (talk | contribs) (Created page with ";Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 992...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Thursday's @ 9am EDT by Zoom

New UITFList entries

General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371 DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370

Last Week's Action Items

  • Sandesh/Probir
    • Follow-up with EMC re-making coil
    • Tally list of jobs once magnet on-site
  • Gary's jobs
    • extend spool and support two locations
    • relocate table further downstream
    • layout modifications for lead wall with hole => Al covers dropped off w/ Vince + Joe submit sho pjob
    • check stand status at mech. shop => most of stand picked up, waiting on top plate + rails
  • Joe's jobs
    • Circuit installed 8/22
    • I&C and DC power cables pulls today 8/24
    • 6" reducers ordered 1-2 weeks
    • Flanges for spool on-hand
    • Other kicker flanges (back)ordered 1-2 weeks lead time
  • DAQ jobs
    • Chris complete rack, move to Mech Room
    • Brad put DAQ on network
    • Riad/Chris decide order Triax adapters, tell Keith/Chris how you want triax terminated at UITF
    • Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
    • Bryan - work with Gary for soft ioc and Brad to activate network port
  • Greg's jobs
    • compute integrated asymmetry
    • use slurm to run jobs on farm
    • simulate 5 configurations

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

Documentation