Meeting 8/25/22 - COMTRA
Jump to navigation
Jump to search
- Thursday's @ 9am EDT by Zoom
- Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09
- Zoom ID: 160 190 6056 and Passcode: 992019
New UITFList entries
- General COMTRA installation => https://tasklists.jlab.org/uitflist/tasks/107371
- DC power magnet install => https://tasklists.jlab.org/uitflist/tasks/107370
Last Week's Action Items
- Sandesh/Probir to-do's
- Follow-up with EMC re-making coil
- Tally list of jobs once magnet on-site
- Gary's to-do's
- extend spool and support two locations
- relocate table further downstream
- layout modifications for lead wall with hole => Al covers dropped off w/ Vince + Joe submit sho pjob
- check stand status at mech. shop => most of stand picked up, waiting on top plate + rails
- Joe's to-do's
- Circuit installed 8/22
- I&C and DC power cables pulls today 8/24
- 6" reducers ordered 1-2 weeks
- Flanges for spool on-hand
- Other kicker flanges (back)ordered 1-2 weeks lead time
- DAQ to-do's
- Chris complete rack, move to Mech Room
- Brad put DAQ on network
- Riad/Chris decide order Triax adapters, tell Keith/Chris how you want triax terminated at UITF
- Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
- Bryan - work with Gary for soft ioc and Brad to activate network port
- Greg's to-do's
- compute integrated asymmetry
- use slurm to run jobs on farm
- simulate 5 configurations
DAQ
- DAQ install at UITF media:220817_DAQ_PREP.pptx
Beamline
- Layout for RadCon media:Compton Layout for Radcon Shielding 8-10-22-3.pptx
- Spool flanges media:Flanges and Reducer for Compton and RF Kicker-jmg.xlsx
- Radiator - (1) on-hand, (1) need for BNL thumb
- Stands PR Shop Job
- Lead for UITF - (11) 2 X 4 X 4, (2) 2 X 4 X 6, (99) 2 X 4 X 8 thumb
Magnet
- Kepco PS - ship 8/31 2 day air => PR
- Magnet EMC PR#1PR#2 coil thumb
Detector
- Bases - due 9/15 - comes with Thi in September
- Collimator - (2) on-hand media:JL0015777_Cu_collimator.pdf thumb
- Absorbers - (6) on-hand media:Absorber - 240 D 001 14_V4.pdf thumb
- Boxes - (2) on hand thumb
- BGO - (2) on-hand thumb thumb thumb thumb thumb
- PMT and mu shields - (4) on-hand thumb
Geant4 Model
Action Items
Documentation
- NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
- Manual - Sharepoint