Feb 7, 2023 - CIS Group meeting
Jump to navigation
Jump to search
Agenda
Upcoming CEBAF/UITF jobs
- Status of UITF (booster, status of gun testing)
- CEBAF "200 kV" jobs (vacuum/table "hooksup" of 200 kV gun, Phil's harp plan)
- Warm girder assembly (upcoming plans, using UITF or LERF)
General Announcements
- Upcoming Meetings
- Tally committees, roles you have/serve on, can be internal/external... send to me within 1 week
Upcoming Meetings/Dates
- February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
- March 5-10, APS In Person Meeting Las Vegas (Riad, Matt) - https://march.aps.org/
- March 7-8, U. Va. Positron Working Group Meeting (Joe, Dennis, Sami, Andriy) - https://indico.jlab.org/event/680/
- March 8-10, JLab Accelerator Advisory Committee Review
- Charge media:JLAAC_Charge_Mar_2023.docx and Agenda media:JLab_AAC_Agenda_Mar_2023_v3.docx
- March 20, SAD begins!
- March 23-24, KEK visit Yoshinori+
- May 7-12, IPAC'23
- G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". media:abstract-1233.pdf
- J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
- M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" media:IPAC23 abstract_Aziz.pdf
- A. Ushakov et al., "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
- S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" media:IPAC23 abstract_Zhang.pdf