Wednesday August 7, 2013

From Ciswikidb
Jump to navigation Jump to search

We will meet in TED 2561B on Wednesday August 7 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

 media:Meeting_7August_2013.pdf
 media:Meeting_7August_2013.pptx  

1- Bubble Chamber progress at Argonne

2- Beam Heating in Cu Radiator media:Beam_Heating_in_Cu_Radiator.pptx media:Beam_Heating_in_Cu_Radiator.pdf

3- Beamline Layout

4- Bubble Chamber cost estimate: procurement and labor

5- Background from 17O(γ,n)16O and subsequent neutron elastic scattering with 16O and 14N nuclei

6- Background from 13C(γ,n)12C (in case we decide to use CO2 instead of N2O)



Notes from this meeting:

  • Beamline Layout:
- Need a Faraday Cup on the Bubble Chamber beamline just before the radiator
- On the main beamline, FC2 is a 1 kW dump (200 uA and 5 MeV)
- PEPPo took positron data with Quads OFF and electron data with Quads ON
- What is the trip limit of the Fast Valve and how fast is it?
- The Bubble Chamber experiment needs electron beam with KINETIC ENERGY = 8.5 MeV
- At Jefferson Lab, an egress has a minimum clearance of 36 inches
- We can use two Super Harps instead of the two Quads. Unfortunately, the accelerator does have Super Harps, only Hall C
  • Cost:

- Procurement overhead is 25% and for labor it is 1.50