PQB Meeting September 10, 2015

From Ciswikidb
Revision as of 14:54, 10 September 2015 by Suleiman (talk | contribs)
Jump to navigation Jump to search

We will meet in TL 2236 Thursday September 10 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Ed Folts: Hall A beamline progress report
  2. Jay Benesch: CEBAF Injector Upgrade
    1. Original Accelerator Improvement Project (AIP) Charter (2010): media:INJ_Full_Energy_Injector_Upgrade_charter.docx
    2. Joe Grames, Considerations for CEBAF Injector Upgrade: media:150824_Upgrade_Grames.pdf
    3. Jay Benesch, Advanced Injector: media:advanced_injector_PQB_10sep2015.pdf




Notes from this meeting:

  • Hall A progress report:
  1. Modulation coils are in the right place. All work is complete and ready for test.
  2. There is plan to install the lumi detectors in Hall A beamline exit pipe.
  3. Cables for cavities on orders and will be pulled once they arrive.
  4. Working on installing the XYQ cavity set.
  5. Halo ladder installed with its QWeak targets and detector table is in place. Still Need to:
    1. Re-design new targets
    2. Pull cables (signal + HV) for the halo detectors


  • CEBAF Injector Upgrade:
  1. The new Quarter Cryo Module (QCM) will be installed in the new Upgrade Injector Test Facility (UITF) in June 2016.
  2. We need to prepare a summary of PQB issues related to the injector. For each problem: symptoms, how was it measured or studied, and if a cause was found or suspected.