AIPINJ Layouts
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Overall Layouts
- July 19, 2019 media:keytotaljuly19.pdf
- July 17, 2019 media:keytotaljuly17.pdf
Gun Layouts
- July 17, 2019 media:gunthroughchopperjuly17.pdf
- June 13, 2019 media:190613_guntochopper.pdf
Chopper Layouts
- chopper assembly media:190606_chopper_assembly_drawing.pdf
Booster Layouts
* Sep 26, 2019 media:190926_boosterregion.pdf -QCM was .32" further downstream. so all those interfaces moved. -distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66". -buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream. -YAO cavity was .37" longer than the design drawing.
- July 17, 2019 media:chopperthroughmodulejuly17.pdf
- June 10, 2019 media:190610_layoutjune10.pdf
Warm-RF Drawings
- prebuncher cavity media:190613_prebuncher.pdf
- buncher cavity media:190815_CEBAF_BUNCHER.pdf
- chopper RF cavity media:Haimson_chopper_cavities.pdf
SRF Drawings
- drawing from Jim Henry media:CRM1107001-0001_-_PDF_1.pdf