Difference between revisions of "Bubble Chamber Meeting Thursday April 26, 2018"

From Ciswikidb
Jump to navigation Jump to search
Line 39: Line 39:
 
* [[Accelerator Test Review]]
 
* [[Accelerator Test Review]]
  
 +
* Beam studies (4/24/18) - Alicia, Joe, Riad [[media:180426_beam_dryrun.docx]]  [[media:180426_beam_dryrun.pdf]]
 +
 +
* Installation Plan ([https://accweb.acc.jlab.org/calendar/ SAD Calendar)]
 +
: Mon/7 - No lockups, installation group, install harp + break
 +
: Tue/8 - No lockups, S&A?
 +
: Wed/9 - No lockups, S&A?
 +
: Thu/10 - SWING lockup possible, anticipate 4K
 +
: Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown read)
  
 
* Bubble Chamber Run Plan
 
* Bubble Chamber Run Plan
 
  
 
* '''Questions:'''
 
* '''Questions:'''

Revision as of 13:50, 26 April 2018

We will meet in TL 2236 on Thursday April 26 at 4:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978#
Meeting URL: http://bluejeans.com/3528502673


Accelerator Schedule

  • Physics run extended to May 6
  • Cryogenic plants are going to 4K on May 6
  • Bubble will run at 4K - we will save time if we stay at 4K instead of waiting to go back to 2K (by Friday May 11th).


Outside Visitors

  1. Kevin (May 7 - 19)
  2. Thomas (May 7 - 14)
  3. Brad (May 7 - 18)
  4. David (May 10 - 19)


 - Tunnel Worker Safety Pre-brief (SAF132) walk-through part of the training is scheduled on May ? at ? (meet in MCC).


Agenda


Mon/7 - No lockups, installation group, install harp + break
Tue/8 - No lockups, S&A?
Wed/9 - No lockups, S&A?
Thu/10 - SWING lockup possible, anticipate 4K
Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown read)
  • Bubble Chamber Run Plan
  • Questions:
Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?
If yes, what special considerations will need to be taken to moth-ball the experiment?


  • Open House:
JLab Open House is on May 19, 2018
Bubble Chamber display (Poster and Animation) is planned in MCC