Difference between revisions of "Bubble Chamber Meeting Wednesday November 11, 2015"
Jump to navigation
Jump to search
(22 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
Phone number: 1-888-240-2560 | Phone number: 1-888-240-2560 | ||
Meeting ID: 3528502673# | Meeting ID: 3528502673# | ||
− | |||
Meeting URL: http://bluejeans.com/3528502673 | Meeting URL: http://bluejeans.com/3528502673 | ||
Line 10: | Line 9: | ||
'''Agenda:''' | '''Agenda:''' | ||
− | 1- | + | 1- Summary of Sept Beam Test: [[media:BeamTest_Summary_I_Sept2015.pdf]] [[media:BeamTest_Summary_I_Sept2015.pptx]] |
2- Beam Schedule in 2016: | 2- Beam Schedule in 2016: | ||
− | # | + | # Test Run II: May 30 – June 20 |
− | # | + | # Test Run III: Aug 15 – Aug 29 |
− | # Expectation to ask for PAC days in FY2017 | + | # Note: Run II and Run III will be considered Injector Facility Development Time. Expectation to ask for PAC days in FY2017. |
+ | 3- Bubble Chamber work at ANL | ||
− | + | 4- Sept beam test data analysis: [[media:Ernst_analysis_Sep2015_2.pdf]] [[media:Ernst_analysis_Sep2015_2.docx]] | |
− | + | 5- Invitation to Elba: June 27-July 1, 2016 | |
+ | |||
+ | |||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Notes from this meeting:''' | ||
+ | |||
+ | * The quarter cryo-unit RF gradients were found to be lower by 5%. However, during the September test, we set the energy using the dipole so we should be very close to the quoted energy. Complete analysis of the beam energy measurements is forthcoming. | ||
+ | |||
+ | * Ernst is calculating bubble chamber sensitivity to gamma ray flux. Previous experiments obtained a limit of <10<sup>-11</sup> with a gamma radioactive source. |
Latest revision as of 15:00, 24 January 2016
We will meet in TL 2221 on Wednesday November 11 at 3:30 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Summary of Sept Beam Test: media:BeamTest_Summary_I_Sept2015.pdf media:BeamTest_Summary_I_Sept2015.pptx
2- Beam Schedule in 2016:
- Test Run II: May 30 – June 20
- Test Run III: Aug 15 – Aug 29
- Note: Run II and Run III will be considered Injector Facility Development Time. Expectation to ask for PAC days in FY2017.
3- Bubble Chamber work at ANL
4- Sept beam test data analysis: media:Ernst_analysis_Sep2015_2.pdf media:Ernst_analysis_Sep2015_2.docx
5- Invitation to Elba: June 27-July 1, 2016
Notes from this meeting:
- The quarter cryo-unit RF gradients were found to be lower by 5%. However, during the September test, we set the energy using the dipole so we should be very close to the quoted energy. Complete analysis of the beam energy measurements is forthcoming.
- Ernst is calculating bubble chamber sensitivity to gamma ray flux. Previous experiments obtained a limit of <10-11 with a gamma radioactive source.