Difference between revisions of "Bubble Demo ME May 9, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 18: Line 18:
 
: (Shaun) Plan/schedule for drawings and fabrication
 
: (Shaun) Plan/schedule for drawings and fabrication
 
: (Riad) Aluminum photon dump dimensions
 
: (Riad) Aluminum photon dump dimensions
: (Grames) Radiator design change
 
:: [[media:140508_RadiatorConcept.pptx]] [[media:140508_RadiatorConcept.pdf]]
 
  
 
'''Beamline components'''
 
'''Beamline components'''
 
: (Joe) Are MBH corrector strengths sufficient?
 
: (Joe) Are MBH corrector strengths sufficient?
 +
:: [[media:140502_Bubble_Haimson.docx]] [[media:140502_Bubble_Haimson.pdf]]
 +
 
: (Joe M.) Is radiator cooling flange sufficient?
 
: (Joe M.) Is radiator cooling flange sufficient?
 +
:: [[media:140508_RadiatorConcept.pptx]] [[media:140508_RadiatorConcept.pdf]]
  
 
'''Bubble Chamber Alignment'''
 
'''Bubble Chamber Alignment'''

Revision as of 08:49, 8 May 2014

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Finalize/sign drawings
(Tim) Identify vendor for DL?
(Tim/Joe/Shaun ?) Identify vendor for DL alignment plate

Beamline layout

(Shaun) Send Joe copy of layout
(Joe) Help categorize component inventory
*re-use from tunnel
*on shelf
*buy part
*design/fab part
(Shaun) Bellows arrangement
(Shaun) Modify support of "green" girder
(Shaun) Plan/schedule for drawings and fabrication
(Riad) Aluminum photon dump dimensions

Beamline components

(Joe) Are MBH corrector strengths sufficient?
media:140502_Bubble_Haimson.docx media:140502_Bubble_Haimson.pdf
(Joe M.) Is radiator cooling flange sufficient?
media:140508_RadiatorConcept.pptx media:140508_RadiatorConcept.pdf

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions