Difference between revisions of "Bubble Demo ME May 9, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 3: Line 3:
 
== SUMMER Installation ==
 
== SUMMER Installation ==
 
'''DL Items'''
 
'''DL Items'''
: (Shaun/Joe) Finalize/sign drawings
+
: (Shaun/Joe) Finalize/sign drawings => Done?
: (Tim) Identify vendor for DL?  
+
: (Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
: (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate
+
: (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => ???
  
 
'''Beamline layout'''
 
'''Beamline layout'''
: (Shaun) Send Joe copy of layout
+
: (Shaun) Send Joe copy of layout => Done
 
: (Joe) Help categorize component inventory
 
: (Joe) Help categorize component inventory
:: *re-use from tunnel
+
:: re-use from tunnel, on shelf, buy part, design/fab part
:: *on shelf
 
:: *buy part
 
:: *design/fab part
 
 
: (Shaun) Bellows arrangement
 
: (Shaun) Bellows arrangement
 
: (Shaun) Modify support of "green" girder
 
: (Shaun) Modify support of "green" girder

Revision as of 08:53, 8 May 2014

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Finalize/sign drawings => Done?
(Tim) Identify vendor for DL? => PR#343083 to get quotes from Alpha Magnetics, New England Technicoil, Stangnes Industries
(Tim/Joe/Shaun ?) Identify vendor for DL alignment plate => ???

Beamline layout

(Shaun) Send Joe copy of layout => Done
(Joe) Help categorize component inventory
re-use from tunnel, on shelf, buy part, design/fab part
(Shaun) Bellows arrangement
(Shaun) Modify support of "green" girder
(Shaun) Plan/schedule for drawings and fabrication
(Riad) Aluminum photon dump dimensions

Beamline components

(Joe) Are MBH corrector strengths sufficient?
media:140502_Bubble_Haimson.docx media:140502_Bubble_Haimson.pdf
(Joe M.) Is radiator cooling flange sufficient?
media:140508_RadiatorConcept.pptx media:140508_RadiatorConcept.pdf

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions