Difference between revisions of "Data Acquisition System"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
=='''DAQ Hardware'''==
 
=='''DAQ Hardware'''==
  
* Electronic Map of Mott Crates (January 29, 2013):
+
* Electronic Map of Mott Crates (February 12, 2014):
 
[[Media:ElectronicsMap_Feb122014.pdf]]
 
[[Media:ElectronicsMap_Feb122014.pdf]]
  
 
[[Media:ElectronicsMap_Feb122014.pptx]]
 
[[Media:ElectronicsMap_Feb122014.pptx]]
  
* Cabling of FADC, Scalers, and TDC (January 29, 2013):  
+
* Cabling of FADC, Scalers, and TDC (February 12, 2014):  
 
[[Media:Cable_Feb122014.pdf]]
 
[[Media:Cable_Feb122014.pdf]]
  
 
[[Media:Cable_Feb122014.pptx]]
 
[[Media:Cable_Feb122014.pptx]]
  
* DAQ Timing (January 29, 2013):  
+
* DAQ Timing (February 12, 2014):  
 
[[Media:DAQ_Timing_Feb122014.pdf]]
 
[[Media:DAQ_Timing_Feb122014.pdf]]
  

Revision as of 15:47, 12 February 2014

DAQ Hardware

  • Electronic Map of Mott Crates (February 12, 2014):

Media:ElectronicsMap_Feb122014.pdf

Media:ElectronicsMap_Feb122014.pptx

  • Cabling of FADC, Scalers, and TDC (February 12, 2014):

Media:Cable_Feb122014.pdf

Media:Cable_Feb122014.pptx

  • DAQ Timing (February 12, 2014):

Media:DAQ_Timing_Feb122014.pdf

Media:DAQ_Timing_Feb122014.pptx


DAQ Software


Manuals and References


To-do List

* Replace "PEPPo" with "Mott" in scripts, decoder, ... .
* Add delayed helicity analysis for Mott_Sample and Mott_SemiInt Modes. Delayed analysis is already included for Scalers and
PEPPo_Int Modes.
* Update MottOnline
* Add BPM Analysis
* Add Block Readout
1- At one time, we used minicom to hard reboot the Mott DAQ VME crate. This service was discontinued. Instead, we will use the RS232
connection on the CAEN VME64X VME8200.
2- Upgrade opsmdaq0.
3- Now we have "opsmdaq0" and "iocmdaq1". It would be a good idea to match names.
4- Standardize "msql" on opsmdaq0.
5- Upgrade from MVME6100/VxWorks to Intel/Linux CPU.