Difference between revisions of "Development Period - February 9-10"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
 
:* '''February 4, 2015:'''
 
:* '''February 4, 2015:'''
 
::* Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
 
::* Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
:* ''' Run 8224 with 1.0 um gold foil and Mott_SemiInt configuration'''
+
:* Run 8224 with 1.0 um gold foil and Mott_SemiInt configuration
  
 
==Test background as a function of target ladder position on large target foil (0 hours)==
 
==Test background as a function of target ladder position on large target foil (0 hours)==
Line 23: Line 23:
 
==Test Mott delayed operation (1 hour):==
 
==Test Mott delayed operation (1 hour):==
 
:* Set of 6 runs while changing between No Delay and Delay=8
 
:* Set of 6 runs while changing between No Delay and Delay=8
:* ''' Runs 8218 - 8223 with 1.0 um gold foil'''
+
:* Runs 8218 - 8223 with 1.0 um gold foil
 
:* [[media:Delayed_Ana.pdf]]  [[media:Delayed_Ana.pptx]]
 
:* [[media:Delayed_Ana.pdf]]  [[media:Delayed_Ana.pptx]]
  

Revision as of 18:05, 11 February 2015

Listed in order of suggested priority...

Re-measure emittance in order to analyze Run 1 conditions (3 hours)

  • February 9, 2015:
  • Identified parameters and details for a procedure
  • Measured emittance and Twiss for 6.3 MeV/c setup
  • Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now

Test hardware TOF veto at 31MHz (4 hours)

  • Runs 8210 - 8217 with 0.225 um gold foil

Test FADC time-of-flight readout (1 hour)

  • February 4, 2015:
  • Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
  • Run 8224 with 1.0 um gold foil and Mott_SemiInt configuration

Test background as a function of target ladder position on large target foil (0 hours)

  • February 9, 2015:
  • Deferred until re-doing emittance measurement at 5.5 MeV/c to try for smaller spot size with 5 or 10 mm rings too

Test Mott delayed operation (1 hour):

Test new Mott DAQ Configurations (1 hour)

  • Measure deadtime with 2.2 uA on 1 um gold foil:
  • Run 8225: Mott_SemiInt configuration (FADC+TDC+Scalers), Deadtime = 28% at 5.1 kHz.
  • Run 8227: SemiIntFast configuration (only readout of FADC, Blocklevel = 1) , Deadtime = 17% at 5.1 kHz.
  • Run 8228: SemiIntBlock configuration (only readout of FADC, Blocklevel = 50) , Deadtime = 1% at 5.1 kHz.