Difference between revisions of "Feb 7, 2023 - CIS Group meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 12: Line 12:
 
=== Upcoming Meetings/Dates ===
 
=== Upcoming Meetings/Dates ===
 
* February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
 
* February 13, Xelera visit for e+ SBIR Phase 1 (Karl, Val, Colwyn, Joe)
* March 5-10, APS In Person Meeting Las Vegas (Riad, Matt) - https://march.aps.org/
+
* March 5-10, APS Meeting, Las Vegas (Riad, Matt) - https://march.aps.org/
* March 7-8, U. Va. Positron Working Group Meeting (Joe, Dennis, Sami, Andriy) - https://indico.jlab.org/event/680/
+
* March 7-8, U. Va. Positron Working Group Meeting, Charlottesville (Joe, Dennis, Sami, Andriy) - https://indico.jlab.org/event/680/
 
* March 8-10, JLab Accelerator Advisory Committee Review
 
* March 8-10, JLab Accelerator Advisory Committee Review
 
** Charge [[media:JLAAC_Charge_Mar_2023.docx]] and Agenda [[media:JLab_AAC_Agenda_Mar_2023_v3.docx]]
 
** Charge [[media:JLAAC_Charge_Mar_2023.docx]] and Agenda [[media:JLab_AAC_Agenda_Mar_2023_v3.docx]]
Line 24: Line 24:
 
** A. Ushakov et al., "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
 
** A. Ushakov et al., "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
 
** S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" [[media:IPAC23 abstract_Zhang.pdf]]
 
** S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" [[media:IPAC23 abstract_Zhang.pdf]]
 +
* May 15-19, LCWS2023 International Workshop on Linear Colliders (Andriy) - https://indico.slac.stanford.edu/event/7467/overview
  
 
=== R&D/Project/Student updates ===
 
=== R&D/Project/Student updates ===

Revision as of 15:24, 6 February 2023

Agenda

Upcoming CEBAF/UITF jobs

  • Status of UITF (booster, status of gun testing)
  • CEBAF "200 kV" jobs (vacuum/table "hooksup" of 200 kV gun, Phil's harp plan)
  • Warm girder assembly (upcoming plans, using UITF or LERF)

General Announcements

  • Upcoming Meetings
  • Tally committees, roles you have/serve on, can be internal/external... send to me within 1 week

Upcoming Meetings/Dates

R&D/Project/Student updates