Difference between revisions of "March 17, 2017 - 200kV gun upgrade meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 3: Line 3:
 
1. Carlos/Gabriel/Bubba - Move gun to Test Lab.  Validate Matt's assertion of plug-and-play of pure alumina vs. conductive insulator, determine stack-up of flange+insulator+electrode.  Close layout/geometry loop between chamber + ME drawings + Poisson.  Assess stock materials for shed/electrode e.g. Nb/Nb or SS/SS.  Main goal is electrode design, but give some thought to testing HV chamber before dismantling.
 
1. Carlos/Gabriel/Bubba - Move gun to Test Lab.  Validate Matt's assertion of plug-and-play of pure alumina vs. conductive insulator, determine stack-up of flange+insulator+electrode.  Close layout/geometry loop between chamber + ME drawings + Poisson.  Assess stock materials for shed/electrode e.g. Nb/Nb or SS/SS.  Main goal is electrode design, but give some thought to testing HV chamber before dismantling.
  
* [[media:170317_Gabriel.pptx]] * [[media:170317_Gabriel.pdf]]
+
* [[media:170317_Gabriel.pptx]], [[media:170317_Gabriel.pdf]]
  
 
2. Phil/Joe - See if can locate two large diameter BPM cans, recall existing length of shorter tunnel NEG w/ bellows each end, sketch proposed tube w/ BPM, magnets, does it all fit?, check with Pete about two channels of electronics
 
2. Phil/Joe - See if can locate two large diameter BPM cans, recall existing length of shorter tunnel NEG w/ bellows each end, sketch proposed tube w/ BPM, magnets, does it all fit?, check with Pete about two channels of electronics

Revision as of 08:40, 17 March 2017

Last week's action items

1. Carlos/Gabriel/Bubba - Move gun to Test Lab. Validate Matt's assertion of plug-and-play of pure alumina vs. conductive insulator, determine stack-up of flange+insulator+electrode. Close layout/geometry loop between chamber + ME drawings + Poisson. Assess stock materials for shed/electrode e.g. Nb/Nb or SS/SS. Main goal is electrode design, but give some thought to testing HV chamber before dismantling.

2. Phil/Joe - See if can locate two large diameter BPM cans, recall existing length of shorter tunnel NEG w/ bellows each end, sketch proposed tube w/ BPM, magnets, does it all fit?, check with Pete about two channels of electronics

3. Marcy - Plan A for vacuum can/diagnostics at gun3 valve, what is useful and makes sense.

4. Joe/Scott - Identify hooks into gun switch software (controls, interlocks), propose modification to allow for gun3 removal

5. John/Matt/Joe - Move Spellman to Test Lab, restore comm for controls to power itself, then test w/ Ross probe, get TOSP ready for HV to Spellman, vacuum chamber, start discussion w/ software for EPICS application.

6. Carlos/John/software - Deploy a radmon at UITF; use FEL control box?, purchase GM tubes, port software app, add to archiver

New action items