Last week's action items

1. Carlos/Gabriel/Bubba - Move gun to Test Lab. Validate Matt's assertion of plug-and-play of pure alumina vs. conductive insulator, determine stack-up of flange+insulator+electrode. Close layout/geometry loop between chamber + ME drawings + Poisson. Assess stock materials for shed/electrode e.g. Nb/Nb or SS/SS. Main goal is electrode design, but give some thought to testing HV chamber before dismantling.

media:170317_Gabriel.pptx, media:170317_Gabriel.pdf

2. Phil/Joe - See if can locate two large diameter BPM cans, recall existing length of shorter tunnel NEG w/ bellows each end, sketch proposed tube w/ BPM, magnets, does it all fit?, check with Pete about two channels of electronics

Pete says super easy
Installed already: VME electronics, wiring, interconnects, downstairs cables
Already purchased, ready to install: (2) Transport RF modules, Lmr cable sets for 2 bpm cans
To do : Install, RG58 cables, update CED, update IOCINSE4, Menu and BPM screens

3. Marcy - Plan A for vacuum can/diagnostics at gun3 valve, what is useful and makes sense.

4. Joe/Scott - Identify hooks into gun switch software (controls, interlocks), propose modification to allow for gun3 removal

Met w/ Scott Higgins
Eliminate Gun3 options, w/o breaking dependencies
Scott will start building a new simplified page, summarize dependencies
Timeframe : May-June for test, ready for July

5. John/Matt/Joe - Move Spellman to Test Lab, restore comm for controls to power itself, then test w/ Ross probe, get TOSP ready for HV to Spellman, vacuum chamber, start discussion w/ software for EPICS application.

6. Carlos/John/software - Deploy a radmon at UITF; use FEL control box?, purchase GM tubes, port software app, add to archiver