(Created page with "===Topics=== ;200kV Gun :fasteners: ordered and due march 6th. :.015" wire: received and handed over. :sapphire roller: ordered and due april 12th. :alumina centering ring: or...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
===Topics===
 
===Topics===
 
;200kV Gun
 
;200kV Gun
:fasteners: ordered and due march 6th.
+
*fasteners: ordered and due march 6th.
:.015" wire: received and handed over.
+
*.015" wire: received and handed over.
:sapphire roller: ordered and due april 12th.
+
*sapphire roller: ordered and due april 12th.
:alumina centering ring: ordered and due april 12th.
+
*alumina centering ring: ordered and due april 12th.
:roller pin: machine shop working, requested due date of march 15th?
+
*roller pin: machine shop working, requested due date of march 15th?
:roller spring: machine shop working, requested due date of march 15th
+
*roller spring: machine shop working, requested due date of march 15th but will be late. material won't be in until next week. shop was slow in resolving vendor and material issues. submitted february 8th, resolved and signed off february 27th.  
  but will be late. material won't be in until next week. shop was slow in
+
*key: received and handed over.
  resolving vendor and material issues. submitted february 8th, resolved  
+
*aft end: machine shop working with requested due date of march 15th?
  and signed off february 27th.  
+
*ring holder: received and handed over
:key: received and handed over.
+
*[https://logbooks.jlab.org/entry/3661138 Status of small shed cathode electrode]
:aft end: machine shop working with requested due date of march 15th?
 
:ring holder: received and handed over
 
:[https://logbooks.jlab.org/entry/3661138 Status of small shed cathode electrode]
 
  
 
;Spring SAD (April 15 - June 10)
 
;Spring SAD (April 15 - June 10)
:List of info I e-mailed to Chris Gould [[media:190228_SA_request.xlsx]]
+
*List of info I e-mailed to Chris Gould [[media:190228_SA_request.xlsx]]
:Danny's dwg for survey measurements [[media:190306_S&A CHECKLIST.pdf
+
*Danny's dwg for survey measurements [[media:190306_S&A CHECKLIST.pdf]]
  
 
;Wien Filter
 
;Wien Filter
:[https://wiki.jlab.org/ciswiki/index.php/200kV_Wien_Filter Link to the Wien filter upgrade page]
+
*[https://wiki.jlab.org/ciswiki/index.php/200kV_Wien_Filter Link to the Wien filter upgrade page]
:Gabriel status update
+
*Gabriel status update
 +
*Wien spin calculation examples for 100kV, 200kV, 350kV, 5MeV, 6.3MeV [[media:190307_SpinCalculator.xlsx]]
  
 
;Latest Layouts
 
;Latest Layouts
:Danny Gun region [[media:190123_gun_to_chopper.pdf]]
+
*Danny Gun region [[media:190123_gun_to_chopper.pdf]]
:Danny Booster region [[media:LAYOUT14FEB19.pdf]]
+
*Danny Booster region [[media:LAYOUT14FEB19.pdf]]
:Danny updated Reza's powerpoint file w/ new dimensions  [[media:190306_Injector upgrade Choppers to Booster v01DM.pptx]]
+
*Danny updated Reza's powerpoint file w/ new dimensions  [[media:190306_Injector upgrade Choppers to Booster v01DM.pptx]]
:Joe Gun + Booster notes [[media:190123_INJ.pptx]]
+
*Joe Gun + Booster notes [[media:190123_INJ.pptx]]

Latest revision as of 10:57, 7 March 2019

Topics

200kV Gun
  • fasteners: ordered and due march 6th.
  • .015" wire: received and handed over.
  • sapphire roller: ordered and due april 12th.
  • alumina centering ring: ordered and due april 12th.
  • roller pin: machine shop working, requested due date of march 15th?
  • roller spring: machine shop working, requested due date of march 15th but will be late. material won't be in until next week. shop was slow in resolving vendor and material issues. submitted february 8th, resolved and signed off february 27th.
  • key: received and handed over.
  • aft end: machine shop working with requested due date of march 15th?
  • ring holder: received and handed over
  • Status of small shed cathode electrode
Spring SAD (April 15 - June 10)