Difference between revisions of "May 26, 2017 - 200kV gun upgrade meeting"

From Ciswikidb
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
=== Summer 2017 SAD Update ===
 +
:[[media:SADCIS_v6.docx]]
 +
 
===200kV Gun===
 
===200kV Gun===
 
* Task and Timeline Gantt chart => [[media:170421_CHG.pdf]]
 
* Task and Timeline Gantt chart => [[media:170421_CHG.pdf]]
 +
:Simulation of the effect of the mesh and the perforated plate [[media:170525_Mesh.pdf]]
  
===325kV Gun .... WHAT ?!?!?===
+
=== NEG Tube===
* [[media:170519_325kV_simulations.pdf]] => Did we talk about this last week?
 
 
 
===Gun2 NEG Tube===
 
 
: We are making 4 BPM's
 
: We are making 4 BPM's
 
: Shop has materials now and machining (#327755)
 
: Shop has materials now and machining (#327755)
: Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
+
: ...then Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
: Pete will perform optical/electrical checks
+
: ...then Pete will perform optical/electrical checks
: John will perform Gabou map
+
: ...then John will perform Gabou map
 
::Final NEG tube design => [[media:NEGTUBE_MAY03.pdf]]
 
::Final NEG tube design => [[media:NEGTUBE_MAY03.pdf]]
 
::M20 Old Assembly Modification [[media:0990.pdf]]
 
::M20 Old Assembly Modification [[media:0990.pdf]]
Line 16: Line 17:
 
::M20 New Assembly 6.00 x 4.500 reducer flange[[media:0.992.pdf]]
 
::M20 New Assembly 6.00 x 4.500 reducer flange[[media:0.992.pdf]]
  
===Gun3 Removal and Diagnostics Chamber Installation ===
+
===Diagnostics Chamber Installation ===
 
: Second bake and activate week of May 30th => [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 Remove and replace Gun3 ATLIS task]
 
: Second bake and activate week of May 30th => [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 Remove and replace Gun3 ATLIS task]
 
: Remove VBV3I02 from special interlock and swap PLC for relays
 
: Remove VBV3I02 from special interlock and swap PLC for relays
  
===Spellman HVPS update===
+
===TOSP/Spellman HVPS update===
 
+
:UITF [[media:UITF-TOSP.pdf]] [[media:UITF-THA.pdf]]
===Radmon update===
 
:[https://logbooks.jlab.org/entry/3473167 Installed at CEBAF]
 
:[https://logbooks.jlab.org/entry/3473203 Checked and ready]
 
 
 
=== Summer 2017 SAD Update ===
 
:[[media:SADCIS_v6.docx]]
 

Latest revision as of 10:05, 26 May 2017

Summer 2017 SAD Update

media:SADCIS_v6.docx

200kV Gun

Simulation of the effect of the mesh and the perforated plate media:170525_Mesh.pdf

NEG Tube

We are making 4 BPM's
Shop has materials now and machining (#327755)
...then Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
...then Pete will perform optical/electrical checks
...then John will perform Gabou map
Final NEG tube design => media:NEGTUBE_MAY03.pdf
M20 Old Assembly Modification media:0990.pdf
M20 New Assembly Can media:0991.pdf
M20 New Assembly 6.00 x 4.500 reducer flangemedia:0.992.pdf

Diagnostics Chamber Installation

Second bake and activate week of May 30th => Remove and replace Gun3 ATLIS task
Remove VBV3I02 from special interlock and swap PLC for relays

TOSP/Spellman HVPS update

UITF media:UITF-TOSP.pdf media:UITF-THA.pdf