== 2024 ==
 +
[[2024 Summer SAD]] - (May-Aug 2024) R30-4/FX/Degrader/Irradiator
 +
 +
== 2023 ==
 +
[[Mar - Jul SAD - Finish Injector Upgrade]]
 +
 +
== 2022 ==
 +
[[February Beam Ops]]
 +
 +
[[Winter SAD 2022]]
 +
 +
== 2020 - 2021 ==
 +
[[CEBAF Injector Upgrade]] (Phase 1 only)
 +
 
== 2019 ==
 
== 2019 ==
[[Summer SAD 2019]]
+
[[Fall SAD 2019]]
 +
 
 
[[Spring SAD 2019]]
 
[[Spring SAD 2019]]
  
Line 8: Line 23:
 
== 2015 ==
 
== 2015 ==
 
[[Summer SAD 2015]]
 
[[Summer SAD 2015]]
 +
 +
== 2009 ==
 +
[[Spring/Summer SAD 2009]]