User contributions
Jump to navigation
Jump to search
- 14:47, 26 October 2015 diff hist 0 N File:Looking into the Death Star.jpg current
- 14:47, 26 October 2015 diff hist 0 N File:Electrode Assembly dry fit.jpg current
- 14:47, 26 October 2015 diff hist +2 GTS meeting 10 27 15
- 14:46, 26 October 2015 diff hist +314 GTS meeting 10 27 15
- 14:33, 26 October 2015 diff hist +1 GTS meeting 10 27 15
- 14:31, 26 October 2015 diff hist 0 N File:Figuring out top heater length.pdf current
- 14:30, 26 October 2015 diff hist 0 GTS meeting 10 27 15
- 14:29, 26 October 2015 diff hist 0 N File:Figuring out top heater length.jpg current
- 14:28, 26 October 2015 diff hist +316 N GTS meeting 10 27 15 Created page with "* Figuring out top heater length. If we use the 70 mm stroke, the heater length including its flange is 14 inches. This will allow the heater to lower 0.5 inches below the cha..."
- 14:25, 26 October 2015 diff hist +74 Gun Test Stand Meeting Minutes and To-Do Lists
- 14:30, 20 October 2015 diff hist -8 GTS meeting 10 20 15 current
- 14:29, 20 October 2015 diff hist +8 GTS meeting 10 20 15
- 14:24, 20 October 2015 diff hist 0 N File:Ball electrode parts clean 01.jpg current
- 14:24, 20 October 2015 diff hist 0 N File:Deposition chamber top flange.jpg current
- 14:23, 20 October 2015 diff hist 0 N File:Anode and spider mounted.jpg current
- 14:23, 20 October 2015 diff hist 0 N File:Anode plate.jpg current
- 14:22, 20 October 2015 diff hist 0 N File:Deposition with long manipulator.jpg current
- 14:19, 20 October 2015 diff hist +1,913 N GTS meeting 10 20 15 Created page with "* Deposition chamber: ** The long manipulator has been installed and preliminary aligned using the anode plate. The length of the manipulator has been checked to be OK. **[[Fi..."
- 13:52, 20 October 2015 diff hist +88 Gun Test Stand Meeting Minutes and To-Do Lists
- 11:31, 6 October 2015 diff hist 0 N File:Ball electrode before and after polishing.jpg current