Difference between revisions of "UITF Operations"
Jump to navigation
Jump to search
Welcome to the UITF Operations Wiki!
Shift Taker Information
(6 intermediate revisions by 2 users not shown) | |||
Line 9: | Line 9: | ||
<td bgcolor="#e0e0f0" valign=top> | <td bgcolor="#e0e0f0" valign=top> | ||
*[[UITC_meeting_minutes|General]] | *[[UITC_meeting_minutes|General]] | ||
− | *[[ | + | *[[E-beam_Irradiation_Experiment|Experiment In-progress]] |
<hr> <!-- line --> | <hr> <!-- line --> | ||
<b>Configuration</b> | <b>Configuration</b> | ||
Line 16: | Line 16: | ||
*[[Beamline_Layout|ME Drawings]] | *[[Beamline_Layout|ME Drawings]] | ||
*[[Beamline_Layout|Elegant/Model Data]] | *[[Beamline_Layout|Elegant/Model Data]] | ||
− | *[[UITC_technical_areas| | + | *[[UITC_technical_areas|Technical areas]] |
<hr> | <hr> | ||
<b>Work Controls</b> | <b>Work Controls</b> | ||
Line 24: | Line 24: | ||
<hr> | <hr> | ||
<b>Users (Past/Present)</b> | <b>Users (Past/Present)</b> | ||
− | * [[ | + | * [[E-beam Irradiation Experiment| Wastewater Irradiation]] |
* [[HDIce| HDIce]] | * [[HDIce| HDIce]] | ||
<hr> | <hr> | ||
Line 35: | Line 35: | ||
*[[Data_Acquisition_and_Control_racks|UITF Rack Layout]] | *[[Data_Acquisition_and_Control_racks|UITF Rack Layout]] | ||
*Inventories | *Inventories | ||
+ | *[[To-do_list]] | ||
</td> | </td> | ||
Line 124: | Line 125: | ||
* [http://ued.acc.jlab.org UED] | * [http://ued.acc.jlab.org UED] | ||
* [[UITF_Operation_How_To's| Common How-to]] | * [[UITF_Operation_How_To's| Common How-to]] | ||
− | * [[Wastewater_Experiment_Commissioning_Plan Wastewater Commissioning Plan]] | + | * [[Wastewater_Experiment_Commissioning_Plan| Wastewater Commissioning Plan]] |
+ | * [https://accweb.acc.jlab.org/presenter/uitf-menu Shift leader summary] | ||
+ | * [[UITF_Notes|Notes and random thoughts]] | ||
</td> | </td> | ||
<!-- Column #2 --> | <!-- Column #2 --> |
Revision as of 11:07, 22 September 2021
Meetings |
Configuration Work Controls Users (Past/Present) Archival Documentation
|
The Upgraded Injector Test Facility (or UITF) is located within the North-West side of the Test Lab (Bldg. 58), and exists to provide a robust proving ground for a variety of accelerator technologies as well as providing a venue in which to perform low energy physics experiments.
Experimental Meetings | Upcoming Schedule | |
UITF Meetings | Logbook | |
Publications | Posters & Proceedings | |
Talks | Proposed Experiments | |
Past Experiments | Facility Overview |
Sign up to this mailing list to receive and share information within the UITF community.
|
|