Line 118: | Line 118: | ||
** Call PDL (Eugene) and ask to rump Solenoid and Torus down. | ** Call PDL (Eugene) and ask to rump Solenoid and Torus down. | ||
− | * When we back again to beam | + | * When we back again to beam permit, we should directly go into FCup |
** Eugune will rump up Solenoid and Torus magnets | ** Eugune will rump up Solenoid and Torus magnets | ||
** Make sure Solenoid FSD is unmasked "There should not be any Yellow or Red lights under the Solenoid FSD" | ** Make sure Solenoid FSD is unmasked "There should not be any Yellow or Red lights under the Solenoid FSD" | ||
Line 125: | Line 125: | ||
** Collimator is at '20 mm' position | ** Collimator is at '20 mm' position | ||
** Request for 2 nA beam | ** Request for 2 nA beam | ||
+ | --> | ||
+ | ** Make sure Solenoid FSD is unmasked "There should not be any Yellow or Red lights under the Solenoid FSD" | ||
+ | ** Make sure HV on all detectors are off except FT CALO. | ||
+ | ** Tagger magnet is "OFF" | ||
+ | ** Collimator is at '20 mm' position | ||
+ | ** Request for 5 nA beam | ||
+ | |||
** Look carefully int Halo counters, all halo counters upstream of the target are counting less than 10 Hz | ** Look carefully int Halo counters, all halo counters upstream of the target are counting less than 10 Hz | ||
** Look into FT Calo scaler screen, which is the main measure how the beam is centered, for reference look https://logbooks.jlab.org/entry/3535015 this, and make sure X and Y asymmetry is close to 0 (less than +/-6% with 2 nA beam, and less than 3% when you go to production current). | ** Look into FT Calo scaler screen, which is the main measure how the beam is centered, for reference look https://logbooks.jlab.org/entry/3535015 this, and make sure X and Y asymmetry is close to 0 (less than +/-6% with 2 nA beam, and less than 3% when you go to production current). | ||
Line 140: | Line 147: | ||
* Sergei has added a new component PCal Ustrips (PCU) in the trigger, it's timing should be checked, call sergei and ask him to take over the DAQ to adjust the relative timing of PCU. This should approximetely take about 1 hour. | * Sergei has added a new component PCal Ustrips (PCU) in the trigger, it's timing should be checked, call sergei and ask him to take over the DAQ to adjust the relative timing of PCU. This should approximetely take about 1 hour. | ||
* As soon Sergei has finished timing adjustment, ask for 35 nA beam, and take production data with trigger_v5.trg | * As soon Sergei has finished timing adjustment, ask for 35 nA beam, and take production data with trigger_v5.trg | ||
− | + | ||
<!-- * If the machine is down and it is back start with low current first (2nA and 5 nA) making sure that the beam is stable in current and position before moving to 30 nA | <!-- * If the machine is down and it is back start with low current first (2nA and 5 nA) making sure that the beam is stable in current and position before moving to 30 nA | ||
--> | --> |
Revision as of 14:09, 22 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- rafopar@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=1.0 mm, Y=-1.5 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/20 - 1:15 AM)
Updated Feb-21, 23:25The plan until Friday Feb 23 noon: Take data with trigger_v5.trg at 35 nA beam
and check again beam is centered, and halo counters still coun order of few Hz.
|
General Instructions:
Every Shift:
Every Run:
|