== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 4/ | + | ''(last update 4/09 - 23:30)'' |
− | *<font color=red> '''When beam to Faraday Cup the Fast Shut Down: Upstream, Midstream, Downstream, BOM and Solenoid should be always Unmasked ''' | + | *<font color=red> '''When beam is being delivered to the Faraday Cup the Fast Shut Down: Upstream, Midstream, Downstream, BOM and Solenoid should be always Unmasked ''' |
*''' No chnages to the FSD threshold without RC or beamline expert approval''' | *''' No chnages to the FSD threshold without RC or beamline expert approval''' | ||
+ | * '''If solenoid trips:''' | ||
+ | ** Call immediately MCC, ask them to stop the beam delivery and bring us down to Power Permit | ||
+ | ** Call the RC | ||
+ | ** Call the engineer on call | ||
+ | ** Call the MM expert to turn the detector off | ||
+ | ** Call SVT expert to turn SVT off | ||
+ | ** Turn off all the other detectors | ||
+ | |||
+ | |||
*'''Always monitor the rates on the Halo counters when they are tuning the beam to hall B or to the other halls''' | *'''Always monitor the rates on the Halo counters when they are tuning the beam to hall B or to the other halls''' | ||
* '''Do Not turn on or off SVT only SVT expert can do that''' | * '''Do Not turn on or off SVT only SVT expert can do that''' | ||
Line 134: | Line 143: | ||
* <font color=red>'''Please contact the Micromegas (BMT, FMT & FTT) expert if there are trips, or if you notice any issues in the online monitoring. Do not turn OFF or ON the MM only the expert can do that. See Log entry https://logbooks.jlab.org/entry/3556528 '''</font> | * <font color=red>'''Please contact the Micromegas (BMT, FMT & FTT) expert if there are trips, or if you notice any issues in the online monitoring. Do not turn OFF or ON the MM only the expert can do that. See Log entry https://logbooks.jlab.org/entry/3556528 '''</font> | ||
+ | == '''Run Plan for Tuesday April 10 Owl and Day shifts''' == | ||
+ | *Continue data taking for production with with trigger_v12.trg @ 45nA 3 hours/run | ||
+ | * If the machine is down for few hours ask for low current first 5 nA make sure that the beam is stable both in position and current, check that the rates are OK on all the detectors and halo counters. Then ask for 45 nA and continue data for production. If there are issues with the beam call the RC. | ||
+ | |||
+ | * <font color=red>'''Please contact the Micromegas (BMT, FMT & FTT) expert if there are trips, or if you notice any issues in the online monitoring. Do not turn OFF or ON the MM only the expert can do that. See Log entry https://logbooks.jlab.org/entry/3556528 '''</font> | ||
<font color=red>'''No Harp scan without notifying the RC '''</font> | <font color=red>'''No Harp scan without notifying the RC '''</font> |
Revision as of 22:43, 9 April 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Spring 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=1.0 mm, Y=-1.5 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 4/09 - 23:30)
Run Plan for Monday April 9 Swing shift
Run Plan for Tuesday April 10 Owl and Day shifts
No Harp scan without notifying the RC In case of other questions or uncertainties of what to do, please call the RC
|
General Instructions:
Every Shift:
Every Run: Log screenshots of:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|